This opportunity has closed
The submission deadline was January 27, 2026. This page is kept for reference purposes.
Spinkler Head Replacement - Matsqui Complex
AI Summary
Opportunity Summary: Sprinkler Head Replacement - Matsqui Complex
Project Scope
- The project involves the replacement of expired sprinkler heads at the Matsqui Complex, which encompasses Pacific, Matsqui, and Fraser Valley institutions. The work is critical for maintaining fire suppression in compliance with NFPA 13 standards.
- Key Tasks:
- Isolate and drain sprinkler systems.
- Remove and replace defective sprinkler heads with specified makes and quantities across multiple buildings.
- Ensure that systems are restored to original finishes post-repair.
- Provide equipment for high-access installations and respond to any damage caused during the work.
Objectives
- Ensure fire suppression continuity by replacing deficient sprinkler heads with equivalent makes/models, as indicated in inspection reports.
Key Deliverables
- Installation of new sprinkler heads according to NFPA 13 standards.
- Submission of shop drawings and specifications for each type of new sprinkler head replaced.
- Provision of spare sprinkler heads for each building’s system.
Important Dates
- Posted: January 12, 2026
- Due Date: January 27, 2026, at 2:00 PM PST
- Performance Period: Completion required by March 31, 2026.
Geographic Restrictions
- Open only to Canadian suppliers.
Required Qualifications
- Mandatory:
- Experience in sprinkler system installation and compliance with NFPA 13 standards.
- Capability to isolate and drain sprinkler systems effectively.
- Ability to restore modified access areas to existing finishes.
- Familiarity with specified sprinkler head models and quantities as outlined in the project documentation.
Evaluation Criteria
- Bids will be evaluated based on compliance with technical specifications, pricing, and the ability to meet project deliverables and timelines.
Preferred Qualifications
- Proven track record of similar installations in institutional settings.
- Availability of equipment necessary for high-access installations.
Contact Information
- Contracting Authority: Katie McKeever
- Email: [email protected]
- Phone: 236-380-2294
Additional Notes
- This procurement is not subject to set-asides for Indigenous suppliers or Comprehensive Land Claims Agreements. No security requirements are stated for this contract.
Conclusion
This opportunity is ideal for Canadian organizations specialized in fire safety systems, particularly those with experience in institutional fire suppression requirements. Interested suppliers should assess their capabilities against the mandatory qualifications and be prepared to demonstrate compliance with all technical specifications outlined in the project scope.
Actions
Create a free account to analyze this opportunity, get daily notifications, and win more bids with Narwin.ai
Documents
Description
Read full description
Sprinkler Head Replacement – Matsqui Complex This requirement is for: The Correctional Service of Canada. Trade agreement: Canadian Free Trade Agreement (CFTA) Policy on Reciprocal Procurement: This solicitation is open only to Canadian suppliers. Competitive Procurement Strategy: Lowest priced compliant bid. Set-aside under the Procurement Strategy for Indigenous Business: This procurement is not subject to any set-asides for Indigenous Suppliers. Comprehensive Land Claim Agreement: This procurement is not subject to a Comprehensive Land Claims Agreement. Security Requirements: This contract does not include security requirements. Nature of Requirements: The following is a summary of the statement of work for this requirement. The Correctional Service of Canada has a requirement to replace sprinkler heads that have expired due to age and require lifecycle replacement for buildings in the Matsqui Complex. That complex includes the following institutions: Pacific, Matsqui and Fraser Valley. The work will involve the following: 1.1 Background: The Correctional Service of Canada’s recent annual fire inspection Contractor has provided Matsqui Complex with reports indicating the sprinkler heads are due for replacement in multiple buildings. 1.2 Objectives: To replace the existing deficient sprinkler heads with the same or equivalent make and model to ensure fire suppression continuity in accordance with the building’s original fire suppression design specifications and NFPA 13 standards. 1.3 Tasks Matsqui Institution: 1.3.1 The Contractor must isolate and drain the sprinkler systems in building M3, Living Unit 1, Living Unit 2 and Living Unit 3 and remove and replace deficient sprinkler heads of the following make and model, in the following quantities: Living Unit 1: V2707 = 90 heads K5.6 155°F V2709 = 108 heads K5.6 155°F Living Unit 2: V2707 = 90 heads K5.6 155°F V2709 = 108 heads K5.6 155°F Living Unit 3: V2707 = 90 heads K5.6 155°F V2709 = 108 heads K5.6 155°F 1.4 Tasks Fraser Valley Institution: 1.4.1 The Contractor must isolate and drain the sprinkler systems in building A, B, D, F and G and remove and replace deficient sprinkler heads of the following make and model, in the following quantities: Building A: TY3231 = 97 heads K80.6 68°C TY3131 = 14 heads K80.6 93°C TY3131 = 6 heads K80.6 68°C TY3335 = 3 heads K80.6 68°C Building B: TY3231 = 42 heads K80.6 68°C TY3131 = 25 heads K80.6 93°C TY3131 = 44 heads K80.6 68°C TY3331 = 1 head K80.6 68°C Building D: VK-302 = 40 heads K 5.6 200°F VK-410 = 22 heads K 5.6 165°F VK-442 = 4 heads K 5.6 200°F VK-300 = 3 heads K 5.6 200°F Building F: V2708 = 71 heads K80.75 68°C V2726 = 26 heads K80.75 79°C V2710 = 6 heads K 5.6 68°C V2710 = 2 heads K80.75 79°C V2716 = 11 heads K80.75 93°C C3201 = 55 heads K 5.6 155°F C3101 = 8 heads K 5.6 200°F BB-117 = 27 heads K112.4 100°C SD1 = 10 heads K80.75 100°C Building G: C2296 = 12 heads K 4.3 155°F C2296 = 1 head K 4.3 200°F 1.5 Tasks Pacific Institution: 1.5.1 The Contractor must isolate and drain the sprinkler systems in Building A and remove and replace deficient sprinkler heads of the following make, model and quantities: 1.5.2 The Contractor must isolate and drain the sprinkler systems in Building B and remove and replace deficient sprinkler heads of the following make, model and quantities: 1.5.3 The Contractor must isolate and drain the sprinkler systems in Building C and remove and replace deficient sprinkler heads of the following make, model and quantities: 1.5.4 The Contractor must isolate and drain the sprinkler systems in Building D and remove and replace deficient sprinkler heads of the following make, model and quantities: 1.5.5 The Contractor must isolate and drain the sprinkler systems in Building F and remove and replace deficient sprinkler heads of the following make, model and quantities: 1.5.6 The Contractor must isolate and drain the sprinkler systems in Building F8 and remove and replace deficient sprinkler heads of the following make, model and quantities: TY3231 = 19 heads K5.6 68°C TY3131 = 5 heads K5.6 68°C V3301 = 6 heads K5.6 68°C 1.5.7 The Contractor must isolate and drain the sprinkler systems in Building G and remove and replace deficient sprinkler heads of the following make, model and quantities: 1.5.8 The Contractor must isolate and drain the sprinkler systems in Building H and remove and replace deficient sprinkler heads of the following make, model and quantities: 1.5.9 The Contractor must isolate and drain the sprinkler systems in Building J and remove and replace deficient sprinkler heads of the following make, model and quantities: GL4231 = 13 heads K4.2 68°C GL4110 = 10 heads K4.1 68°C 1.5.10 The Contractor must isolate and drain the sprinkler systems in Building N and remove and replace deficient sprinkler heads of the following make, model and quantities: V3201 = 22 heads K5.6 68°C VK3101 = 9 heads K5.6 121°C TY3131 = 3 heads K5.6 93°C 1.5.11 The Contractor must isolate and drain the sprinkler systems in Building P and remove and replace deficient sprinkler heads of the following make, model and quantities: TY3131 = 30 heads K5.6 68°C VK3101 = 8 heads K5.6 121°C V3301 = 9 heads K5.6 68°C 1.5.12 The Contractor must isolate and drain the sprinkler systems in Building Q remove and replace deficient sprinkler heads of the following make, model and quantities: TY3231 = 66 heads K5.6 68°C 1.5.13 The Contractor must isolate and drain the sprinkler systems in Building S and remove and replace deficient sprinkler heads of the following make, model and quantities: V3201 = 44 heads K5.6 68°C VK3101 = 2 heads K5.6 68°C 1.5.15 The Contractor must supply the correct quantity of spare sprinkler heads for the spare head box located at each building system’s sprinkler tree as per NFPA 13. 1.5.16 The Contractor is responsible for the control of releasing water from the sprinkler system and the Contractor must rectify any resulting damage. 1.5.17 The Contractor is responsible for returning damage caused by the Contractors personnel or areas the Contractor modified to obtain access to the sprinkler heads back to existing finishes. 1.5.18 The Contractor must provide the equipment needed to access high located sprinkler heads. 1.6 Deliverables: 1.6.1 The Contractor must provide and install the new sprinkler heads in accordance with NFPA 13 standards. 1.6.2 The Contractor must provide the new sprinkler head manufacturer’s shop drawings and specifications to Facilities Management for each type of sprinkler head the Contractor replaces. 1.7 Location of work: 1.6.1. The Contractor must perform the work at: a. Matsqui Complex -Central Heat Plant, 33344 King Road, Abbotsford, BC V2S 4P3 1.8 Travel 1.7.1 No travel is anticipated for the performance of the work under this contract. 1.9 Language of Work: 1.8.1 The contractor must perform all work in English. Any conditions for participation of suppliers not specified in solicitation documentation: none. Estimated quantity of commodity: see solicitation document statement of work and basis of payment. Duration of Contract and Time Frame for Delivery: The Contractor must perform and complete the work by March 31, 2026, from the date of notification of acceptance of the offer. File Number: 21807-25-0078 Contracting Authority: Katie McKeever Telephone number: 236-380-2294 E-mail: [email protected] NOTE TO BIDDERS: Bidders can obtain the complete statement of work and evaluation criteria by downloading the solicitation document and associated documents from the website. The Crown reserves the right to negotiate with suppliers on any procurement. Documents may be submitted in either official language of Canada (English or French). After contract award, bidders may request a debriefing on the results of the bid solicitation process. Bidders should make the request to the Contracting Authority within fifteen (15) working days of receipt of the results of the bid solicitation process. The debriefing may be in writing, by telephone or in person. Procurement Assistance Canada (PAC) offers seminars to businesses interested in learning how to sell goods and services to the Government of Canada. The seminars are FREE. Topics include: ? Understand the federal procurement process; ? Learn about searching for opportunities; ? Find out how to bid on opportunities; ? Discover how to prepare to sell to the government. The full schedule of seminars can be found on the Procurement Assistance Canada website, under find an event (Procurement Assistance Canada: Find an event - Canada.ca).
Additional Information
Source
canadabuys
Status
closed
Procurement Method
Competitive - Traditional
Procurement Category
Construction
Selection Criteria
Lowest Price
Regions of Opportunity
Abbotsford
Regions of Delivery
Abbotsford *British Columbia *Canada
Reference Number
cb-872-39032453
Amendment Number
000
Contracting Entity
Correctional Service of Canada (CSC)
Contact Name
Katie McKeever
Contact Email
Contact Phone
+12363802294
Contact Country
CANADA
Organization City
ABBOTSFORD
Organization Province / State
BC
Organization Country
CANADA
Last Updated
July 29, 2026
Frequently Asked Questions
When is the proposal submission deadline?
The proposal submission deadline is January 27, 2026 (Overdue).
Note: This opportunity has already closed. See similar active opportunities above.
Similar open opportunities 5 available
Since this opportunity has closed, here are similar active opportunities you may be interested in:
Fraser Valley CCTV Upgrade
Fraser Valley CCTV Upgrade
Highway Trailer Rental for CORCAN
Victim-offender mediation (VOM) services
Simulation‑Based Nursing Education Services (SIMS), Ontario Region
Explore More Opportunities
Open tenders from this agency
- Fraser Valley CCTV Upgrade
RFP · Due November 20, 2026
- Fraser Valley CCTV Upgrade
Competitive - Selective tendering · Due November 20, 2026
- Victim-offender mediation (VOM) services
Advance contract award notice · Due November 10, 2026
- Highway Trailer Rental for CORCAN
Competitive - Open bidding · Due November 25, 2026
- Simulation‑Based Nursing Education Services (SIMS), Ontario Region
RFP · Due November 17, 2026
Historical Contracts
Research past opportunities
All Active Opportunities
Search all current contracts
Narwin.ai is a great way to find government contracts and opportunities. Disclaimer: This bid/tender/opportunity information is presented as is and may be incorrect at times. Please read the tender documents carefully before finalizing bids. We do not accept any responsibility and cannot be held legally liable for any inaccuracies.