This opportunity has closed

The submission deadline was February 27, 2026. This page is kept for reference purposes.

View 5 similar active opportunities →

Canadian Air and Precipitation Monitoring Network – Bonner Lake

Department of the Environment (ECCC )
CanadaBuys Posted: February 3, 2026

AI Summary

Opportunity Summary

Title: Canadian Air and Precipitation Monitoring Network – Bonner Lake
Issuing Organization: Environment and Climate Change Canada (ECCC)
Location: Gatineau, Quebec, Canada
Contact Email: Nathalie Shannon ([email protected])
Posted Date: February 3, 2026
Due Date: February 27, 2026, at 3:00 PM EST
Performance Period: Contract extends for daily technical support throughout the year (7 days per week, 52 weeks).

Project Scope and Objectives:
ECCC seeks a contractor to provide daily technical support at the Canadian Air and Precipitation Monitoring Program (CAPMoN) Bonner Lake site, located near Moonbeam, Ontario. The role includes the collection, processing, and shipping of air and precipitation samples, as well as maintaining monitoring equipment according to established Standard Operating Procedures (SOPs).

Required Certifications/Registrations:

  • Valid Reliability Security Clearance.

Mandatory Qualifications:

  • Knowledge of local weather conditions.
  • Proficiency in English (written and oral) for primary and backup resources.
  • Availability for two inspections annually during normal sample collection periods.
  • Access to reliable transportation to and from the site.
  • Must utilize a buddy system for safety when working alone in an isolated area.

Preferred Qualifications:

  • Experience with environmental sampling and equipment maintenance.
  • Familiarity with environmental monitoring standards and practices.

Geographic Restrictions:

  • Contractor must be able to reliably travel to Bonner Lake, near Moonbeam, Ontario, Canada.

Key Technical Capabilities Needed:

  • Experience in servicing air filter sampling systems, ozone sampling systems, precipitation collectors, and particulate matter measurements.
  • Familiarity with climatological and meteorological instruments.

Deliverables and Performance Standards:

  • Daily collection and processing of air and precipitation samples.
  • Adherence to CAPMoN SOPs.
  • Regular reading and recording of gauges, diagnostics, troubleshooting, and minor repairs of monitoring equipment.

Evaluation Criteria:

  • Bids will be evaluated based on compliance with mandatory requirements, relevant experience, and capability to meet the project scope and performance standards.

Submission Instructions:
Interested bidders must submit proposals to ECCC by the due date, ensuring compliance with all outlined requirements and conditions in the solicitation documentation.

Due Date
February 27, 2026
(Overdue)
Solicitation #
5000090636

Actions

Create a free account to analyze this opportunity, get daily notifications, and win more bids with Narwin.ai

Documents

5000090636_solicitation_en.pdf
PDF • 2.1 MB

Description

Read full description

The Contractor hereby agrees to: 1. Objective Environment and Climate Change Canada (ECCC) requires a Contractor for daily technical support (7 days per week, 52 weeks per year) at the Canadian Air and Precipitation Monitoring Program (CAPMoN) Bonner Lake site located approximately 8 km northeast of Moonbeam, Ontario with coordinates N 49.385528° latitude, W 82.121250° longitude. 2. Background ECCC operates an environmental research and monitoring station in the area which forms part of ECCC’s national network of CAPMoN stations. The primary focus of this monitoring station is the daily collection of precipitation and/or air samples. Environmental data is collected from both automatic and manual samplers. A contract operator is required to attend to the station to retrieve and process the samples according to the CAPMoN Standard Operating Procedures (SOP's). The samples are then packaged and shipped for analysis to the CAPMoN National Laboratory located in Toronto, Ontario. Other daily duties include reading and recording of various gauges, diagnostics, and regular servicing, troubleshooting, and minor repair of a variety of monitoring equipment. On-site training will be provided by ECCC technical staff. 3. Details of Work to be Performed All sampling, shipping, and maintenance must be performed in accordance with the Site Operations Reference Manuals; and in accordance with any amendments to the aforementioned manuals. The routine may involve additional collectors, passive samplers and various climatological and meteorological instruments. ECCC will provide the Contractor the aforementioned manuals and amendments. 4. Tasks and Deliverables: Firm Requirement: 1. The Contractor will be responsible for servicing: a. Air Filter Sampling System See Appendix 1 to Annex A b. Ozone Sampling System: See Appendix 2 to Annex A c. Precipitation Collector: See Appendix 3 to Annex A d. PM Measurements: See Appendix 4 to Annex a 5. General Conditions: 1. The Contractor must have knowledge of local weather conditions. 2. The Contractor will be supplied with a phone number and name for emergencies. Only the Technical Authority can make any changes to the sampling program. All changes will be made known to the Contractor, either orally or in writing, or both. 3. The Contractor must have at least two resources (to a maximum of four resources), a Primary resource and a Back-up resource. The back-up resource(s) must service the measurement site at least once per month. 4. The Primary resource and Back-up resource(s) must be proficient in English, both written and oral. 5. All resources (including the designated backup(s)) must make themselves available for two inspections each year as well as for certifications as required. The inspections will be during normal sample collection periods and should take less than 2 hours each. 6. Smoking is not permitted within 500 meters of the compound. Vehicles must not approach closer than the designated parking area. The Contractor must not enter the building with contaminated clothing or footwear. 7. The Contractor must not bring toxic or contaminating compounds such as oil based products, road salt, soaps, disinfectants, or insect repellents to the CAPMoN station. No paints, solvents or glues must be used onsite or in the vicinity of the compound. 8. The Contractor must clean and wash the interior of the building when required using only distilled or de-ionized water as supplied by ECCC and dust must be swept or vacuumed. 9. The Contractor must contribute to the security of the site by adhering to the use of locks where applied. Any suspicious activity or tampering of the site equipment must be reported to the Technical Authority, as should any event or activity that may compromise the sampling integrity. 10. No animals or pets are to be inside the building. 11. The Contractor must have access to reliable transportation to and from the Site. 12. The Contractor must ensure the issue of working alone at an isolated location is addressed by using a buddy type system. 13. The primary resource and back-up resource(s) must review and sign off on all site safe work procedures (SWP) and task hazard analysis (THA) every year. Failure to comply with safety practices could result in the discontinuation of the contract. 14. All Contractors must hold a valid Reliability Security Clearance.

Additional Information

Source

canadabuys

Status

closed

Procurement Method

Competitive - Open bidding

Procurement Category

Services

Selection Criteria

Variations or combinations of the above methods

Regions of Opportunity

Ontario (except NCR)

Regions of Delivery

Ontario (except NCR)

Reference Number

cb-429-20330663

Amendment Number

000

Contracting Entity

Department of the Environment (ECCC )

Contact Name

Nathalie Shannon

Contact Email

Contact Phone

+18738004734

Contact Country

Canada

Organization City

Gatineau

Organization Province / State

Quebec

Organization Country

Canada

Last Updated

July 29, 2026

Frequently Asked Questions

When is the proposal submission deadline?

The proposal submission deadline is February 27, 2026 (Overdue).

Note: This opportunity has already closed. See similar active opportunities above.

Explore More Opportunities

Open tenders from this agency

All tenders from Department of the Environment (ECCC ) 273 past tenders

Historical Contracts

Research past opportunities

All Active Opportunities

Search all current contracts

Narwin.ai is a great way to find government contracts and opportunities. Disclaimer: This bid/tender/opportunity information is presented as is and may be incorrect at times. Please read the tender documents carefully before finalizing bids. We do not accept any responsibility and cannot be held legally liable for any inaccuracies.