DEPT OF DEFENSE.DEPT OF THE NAVY.NAVSUP.NAVSUP WEAPON SYSTEMS SUPPORT.NAVSUP WSS MECHANICSBURG.NAVSUP WEAPON SYSTEMS SUPPORT MECH, Pennsylvania
DEPT OF DEFENSE.DEPT OF THE NAVY.NAVSUP.NAVSUP WEAPON SYSTEMS SUPPORT.NAVSUP WSS MECHANICSBURG.NAVSUP WEAPON SYSTEMS SUPPORT MECH is a public-sector buyer in Pennsylvania. Narwin currently lists 500 open tenders from this agency, each with its solicitation type and due date. The list below is the set of open notices, separate from the source portal.
Advanced Search500 Active Opportunities
Page 1 of 1- VALVE, SOL 3-WAY · RFP · Due Dec 21, 2026
- 91--GREASE,AIRCRAFT · RFP · Due Dec 21, 2026
- 70--SERVER ASSEMBLY 3U, IN REPAIR/MODIFICATION OF · RFP · Due Jan 4, 2027
- 48--VALVE,BALL · RFP · Due Jan 4, 2027
- 70--TI16-J02 JBOT,4U, IN REPAIR/MODIFICATION OF · RFP · Due Dec 21, 2026
- ACTUATOR,ELECTRO-ME · RFP · Due Dec 3, 2026
- SWITCH,RADIO FREQUE · RFP · Due Dec 8, 2026
- 49--TEST SET SUBASSEMBL · RFP · Due Dec 17, 2026
- VALVE ASSEMBLY,MANI · RFP · Due Dec 17, 2026
- CIRCUIT CARD ASSEMB · RFP · Due Dec 4, 2026
- 13--CASE,AFTERBODY TORP · RFP · Due Dec 14, 2026
- 9530 ROUND BAR · RFP · Due Dec 3, 2026
- VALVE,PRESS REDUCIN · RFP · Due Dec 17, 2026
- HOSE ASSEMBLY,NONME · RFP · Due Dec 18, 2026
- JUNCTION INTERFACE · RFP · Due Dec 3, 2026
- HOSE ASSEMBLY,SPECI · RFP · Due Nov 27, 2026
- GLAND,VALVE · RFP · Due Dec 17, 2026
- VALVE,REGULATING,FL · RFP · Due Dec 30, 2026
- PINTLE · RFP · Due Dec 11, 2026
- FIBER OPTIC LIGHTIN · RFP · Due Nov 30, 2026
- 44--COOLER ASSEMBLY · RFP · Due Dec 19, 2026
- CONNECTOR,THRU-HULL · RFP · Due Dec 4, 2026
- 70--SERVER,AUTOMATIC DA · RFP · Due Dec 21, 2026
- VALVE,CHECK · RFP · Due Dec 17, 2026
- 61--INTEGRATOR UNIT, IN REPAIR/MODIFICATION OF · RFP · Due Jan 4, 2027
- VALVE,GATE · RFP · Due Dec 4, 2026
- ELBOW,PIPE · RFP · Due Dec 7, 2026
- 61--CABLE ASSEMBLY,SPEC · RFP · Due Dec 9, 2026
- 44--COOLER ASSEMBLY · RFP · Due Dec 19, 2026
- 66--INERTIAL MEASURING, IN REPAIR/MODIFICATION OF · RFP · Due Dec 11, 2026
- BALL KIT, CERAMIC · RFP · Due Dec 4, 2026
- PIN,SPRING · RFP · Due Dec 3, 2026
- 59--CIRCUIT CARD ASSEMB, IN REPAIR/MODIFICATION OF · RFP · Due Dec 2, 2026
- OIL FILTER PORT · RFP · Due Dec 3, 2026
- 5-TON CHAIN HOIST · RFP · Due Dec 18, 2026
- ADAPTER,HOUSING · RFP · Due Dec 17, 2026
- PIN,SPRING · RFP · Due Dec 3, 2026
- REPAIR MODULE,STRAI · RFP · Due Nov 20, 2026
- 29--STARTER,ENGINE,AIR - AND OTHER REPLACEMENT PARTS · RFP · Due Jan 4, 2027
- ROD,THREADED END · RFP · Due Dec 14, 2026
- 61--CABLE ASSEMBLY,SPEC · RFP · Due Dec 9, 2026
- 66--INERTIAL MEASURING, IN REPAIR/MODIFICATION OF · RFP · Due Dec 11, 2026
- POPPET · RFP · Due Dec 30, 2026
- 59--CONNECTOR,ELECTRIC · RFP · Due Dec 2, 2026
- DISK, FILTER · RFP · Due Dec 14, 2026
- CIRCUIT CARD ASSEMB · RFP · Due Dec 14, 2026
- DIAPHRAM, PRIMARY · RFP · Due Nov 30, 2026
- INDICATOR,DIGITAL D · RFP · Due Dec 2, 2026
- 59--INDUCTOR · RFP · Due Dec 28, 2026
- ANODE ASSY10-2,10.0 · RFP · Due Dec 2, 2026
- ROD,WELDING · RFP · Due Dec 1, 2026
- BONNET ASSEMBLY · RFP · Due Dec 1, 2026
- 59--SWITCH · RFP · Due Jan 4, 2027
- RING,CLAMPING · RFP · Due Dec 16, 2026
- 13--CONFI. SAMPLE H · RFP · Due Jan 4, 2027
- 58--TOWED ARRAY SUBASSE · RFP · Due Dec 15, 2026
- 59--SWITCH, ROTARY · RFP · Due Dec 17, 2026
- NUT,SLFLKG · RFP · Due Dec 1, 2026
- 59--TRANSFORMER ASSEMBL, IN REPAIR/MODIFICATION OF · RFP · Due Dec 17, 2026
- 13--CONFI. SAMPLE G · RFP · Due Jan 4, 2027
- PARTS KIT,BALL VALV · RFP · Due Dec 16, 2026
- 61--MOTOR,AC, IN REPAIR/MODIFICATION OF · RFP · Due Jan 4, 2027
- 58--TOWED ARRAY SUBASSE · RFP · Due Dec 15, 2026
- SCREW,CAP,SOCKET HE · RFP · Due Dec 1, 2026
- 61--MOTOR,ALTERNATING C, IN REPAIR/MODIFICATION OF · RFP · Due Jan 4, 2027
- SWITCH,NETWORK,ATM · RFP · Due Dec 16, 2026
- INSULATION SLEEVING · RFP · Due Dec 17, 2026
- VALVE,GLOBE · RFP · Due Dec 11, 2026
- 43--PUMP,CENTRIFUGAL - AND SIMILAR REPLACEMENT PARTS, IN REPAIR/MODIFICATION OF · RFP · Due Dec 16, 2026
- VALVE,BALL · RFP · Due Dec 1, 2026
- VALVE,REGULATING,SY · RFP · Due Dec 2, 2026
- LIFT BEAM · RFP · Due Dec 28, 2026
- 34--ROD,WELDING · RFP · Due Dec 1, 2026
- BONNET ASSEMBLY · RFP · Due Dec 1, 2026
- COMPRESSOR,AIR,MP · RFP · Due Nov 23, 2026
- BALL & SEAT SET · RFP · Due Dec 18, 2026
- CONTACTOR,MAGNETIC · RFP · Due Nov 20, 2026
- DISK,VALVE · RFP · Due Dec 18, 2026
- 48--POPPET,VALVE - AND SIMILAR REPLACEMENT PARTS · RFP · Due Dec 14, 2026
- BATTERY, BACK UP · RFP · Due Nov 20, 2026
- VALVE,GLOBE · RFP · Due Nov 24, 2026
- BOOT,TERMINAL,TY-3 · RFP · Due Dec 14, 2026
- BELL MODULE · RFP · Due Nov 30, 2026
- SEALING MACHINE · RFP · Due Nov 30, 2026
- ELBOW · RFP · Due Dec 14, 2026
- STEM,FLUID VALVE · RFP · Due Dec 18, 2026
- control, steering · RFP · Due Nov 30, 2026
- Fair Opportunity to Quote 26063-0003 · RFP · Due Nov 20, 2026
- 58--RF MODULE ASSEMBLY, IN REPAIR/MODIFICATION OF · RFP · Due Dec 14, 2026
- A4,I/O,BOX,TI16 · RFP · Due Dec 31, 2026
- DIAPHRAM, PRIMARY · RFP · Due Nov 30, 2026
- VALVE,LINEAR,DIRECT · RFP · Due Nov 23, 2026
- VALVE,BALL · RFP · Due Dec 14, 2026
- 58--INDICATOR,DEPTH, IN REPAIR/MODIFICATION OF · RFP · Due Dec 14, 2026
- PUMP,ROTARY · RFP · Due Nov 23, 2026
- 59--CIRCUIT CARD ASSEMB, IN REPAIR/MODIFICATION OF · RFP · Due Dec 14, 2026
- LI CBL FUSE PH A R · RFP · Due Dec 14, 2026
- 48--POPPET,VALVE - AND SIMILAR REPLACEMENT PARTS · RFP · Due Dec 14, 2026
- 1377-00-793-9926, M012, Impulse Cartridge · RFP · Due Dec 1, 2026
- 53--PLATE,MOUNTING · RFP · Due Dec 29, 2026
- 59--TRANSFORMER ASSEMBL, IN REPAIR/MODIFICATION OF · RFP · Due Dec 15, 2026
- 66--ANION GUARD COLUMN · RFP · Due Dec 30, 2026
- MODULE, EXTRNL I/O · RFP · Due Nov 27, 2026
- PUMP UNIT,ROTARY · RFP · Due Nov 27, 2026
- 59--KA-BAND SOLID STATE, IN REPAIR/MODIFICATION OF · RFP · Due Dec 14, 2026
- ROD,THREADED END · RFP · Due Dec 14, 2026
- TURBOCHARGER · RFP · Due Nov 20, 2026
- 43--ROUGHING PUMP, IN REPAIR/MODIFICATION OF · RFP · Due Dec 14, 2026
- 59--CIRCUIT CARD ASSEMB, IN REPAIR/MODIFICATION OF · RFP · Due Dec 14, 2026
- 53--COVER,ACCESS · RFP · Due Nov 20, 2026
- 48--VALVE,LINEAR,DIRECT · RFP · Due Dec 14, 2026
- SCREW,MACHINE · RFP · Due Dec 14, 2026
- 48--MANIFOLD ASSEMBLY - AND SIMILAR REPLACEMENT PARTS, IN REPAIR/MODIFICATION OF · RFP · Due Dec 1, 2026
- AMPLIFIER POWER GRO · RFP · Due Dec 22, 2026
- CIRCUIT CARD ASSEMB · RFP · Due Dec 14, 2026
- SEAT-VL URETHANE · RFP · Due Dec 14, 2026
- DISK,RUPTURABLE · RFP · Due Nov 30, 2026
- 59--CIRCUIT CARD ASSEMB, IN REPAIR/MODIFICATION OF · RFP · Due Dec 14, 2026
- 53--PLATE,MOUNTING · RFP · Due Dec 7, 2026
- DSP PWR PC CHAMPAV · RFP · Due Nov 27, 2026
- 61--BATTERY ASSEMBLY, IN REPAIR/MODIFICATION OF · RFP · Due Dec 14, 2026
- CYLINDER ASSEMBLY, A · RFP · Due Nov 20, 2026
- 59--CIRCUIT CARD ASSEMB, IN REPAIR/MODIFICATION OF · RFP · Due Jan 12, 2027
- SERVER,AUTOMATIC DA · RFP · Due Dec 11, 2026
- UNIT, ENVIRONMENTAL · RFP · Due Nov 27, 2026
- 59--COIL,RADIO FREQUENC · RFP · Due Dec 14, 2026
- 13--CASE,AFTERBODY TORP · RFP · Due Dec 14, 2026
- 58--TOWED ARRAY SUBASSE · RFP · Due Dec 28, 2026
- 59--CONNECTOR,ELECTRIC · RFP · Due Nov 27, 2026
- DISK, FILTER · RFP · Due Dec 14, 2026
- 58--HYDROPHONE ASSEMBLY- AND SIMILAR REPLACEMENT PARTS · RFP · Due Nov 30, 2026
- CLAMP ASSEMBLY,MUZZ · RFP · Due Dec 4, 2026
- 59--PRINTED CIRCUIT BOA · RFP · Due Dec 11, 2026
- SERVER,AUTOMATIC DA · RFP · Due Dec 11, 2026
- PINTLE · RFP · Due Dec 11, 2026
- 20--HATCH,MARINE, IN REPAIR/MODIFICATION OF · RFP · Due Nov 20, 2026
- ELEC. OVLD RELAY · RFP · Due Dec 11, 2026
- 30--ADAPTER,HOUSING · RFP · Due Dec 11, 2026
- 47--1.5"BASKET STRAINER · RFP · Due Dec 11, 2026
- VALVE ASSEMBLY,MANI · RFP · Due Dec 11, 2026
- 48--VLV, REGUL PRESSURE · RFP · Due Dec 11, 2026
- 48--VALVE,REGULATING,FL, IN REPAIR/MODIFICATION OF · RFP · Due Dec 11, 2026
- 58--INDICATOR,DEPTH, IN REPAIR/MODIFICATION OF · RFP · Due Dec 14, 2026
- PUMP,CENTRIFUGAL · RFP · Due Dec 4, 2026
- STUFFING BOX ASSEMB · RFP · Due Nov 27, 2026
- 61--MOTOR,ALTERNATING C, IN REPAIR/MODIFICATION OF · RFP · Due Nov 23, 2026
- VALVE, SOLENOID · RFP · Due Dec 10, 2026
- 47--PIPE, 8IN · RFP · Due Nov 23, 2026
- WIRING HARNESS · RFP · Due Dec 15, 2026
- 59--CIRCUIT CARD ASSEMB, IN REPAIR/MODIFICATION OF · RFP · Due Nov 20, 2026
- RECEIVER SUBASSEMBL · RFP · Due Dec 10, 2026
- 48--VALVE,PLUG · RFP · Due Dec 9, 2026
- NUT, SELF-LKG, HE · RFP · Due Nov 24, 2026
- 59--RELAY ASSEMBLY, IN REPAIR/MODIFICATION OF · RFP · Due Dec 10, 2026
- BOLT,THRUST NEUTRAL · RFP · Due Dec 4, 2026
- GUIDE GOVERNOR · RFP · Due Dec 10, 2026
- VALVE, STEM · RFP · Due Dec 10, 2026
- PLATE,MOUNTING · RFP · Due Jan 4, 2027
- TOWED ARRAY SUBASEM · RFP · Due Jan 4, 2027
- PLATE ASSY,RES (A3) · RFP · Due Dec 9, 2026
- VALVE ASSEMBLY,MANI · RFP · Due Dec 9, 2026
- RING,CLAMPING · RFP · Due Dec 9, 2026
- STUD,CONTINUOUS THD · RFP · Due Nov 24, 2026
- PLATE,MOUNTING · RFP · Due Jan 4, 2027
- PRINTED WIRING BOAR · RFP · Due Dec 10, 2026
- 47--HOSE ASSEMBLY,METAL · RFP · Due Dec 28, 2026
- VALVE, GLOBE · RFP · Due Dec 9, 2026
- 48--VALVE, PRESS RDCR, IN REPAIR/MODIFICATION OF · RFP · Due Dec 28, 2026
- IMU, SDI · RFP · Due Dec 9, 2026
- 12--PERISCOPE,TUBE,OUT · RFP · Due Nov 25, 2026
- PLATE,MOUNTING · RFP · Due Dec 30, 2026
- 59--CIRCUIT CARD ASSEMB, IN REPAIR/MODIFICATION OF · RFP · Due Nov 20, 2026
- ELECTRONIC C/B CARD · RFP · Due Nov 23, 2026
- SEAT,VALVE · RFP · Due Dec 18, 2026
- ELBOW,PIPE · RFP · Due Dec 18, 2026
- PLATE,MOUNTING · RFP · Due Dec 4, 2026
- TOWED ARRAY SUBASEM · RFP · Due Dec 4, 2026
- PLATE,MOUNTING · RFP · Due Dec 4, 2026
- RELAY,ROTARY · RFP · Due Dec 7, 2026
- VALVE, BACK PRESS · RFP · Due Nov 23, 2026
- 47--HOSE ASSEMBLY,NONME · RFP · Due Dec 7, 2026
- 61--FUSE BLK/EMI A11, IN REPAIR/MODIFICATION OF · RFP · Due Nov 23, 2026
- TAPE, THRM CNDCT · RFP · Due Dec 7, 2026
- SPRING,HELICAL,COMP · RFP · Due Dec 7, 2026
- PWA DCI · RFP · Due Dec 7, 2026
- CONNECTOR,PLUG,ELEC · RFP · Due Dec 7, 2026
- 59--CIRCUIT CARD ASSEMB, IN REPAIR/MODIFICATION OF · RFP · Due Dec 7, 2026
- ACTUATOR,ELECTRO-PN · RFP · Due Dec 7, 2026
- 59--ELECTRONIC COMPONEN, IN REPAIR/MODIFICATION OF · RFP · Due Dec 22, 2026
- CYLINDER ASSEMBLY · RFP · Due Dec 4, 2026
- STOPPER,BOTTLE · RFP · Due Dec 7, 2026
- VALVE,REGULATING,FL · RFP · Due Dec 7, 2026
- VALVE,CHECK · RFP · Due Nov 30, 2026
- SEAT-VL URETHANE · RFP · Due Dec 7, 2026
- ANTENNA · RFP · Due Nov 23, 2026
- PLATE,MOUNTING · RFP · Due Nov 30, 2026
- PARTS KIT,BALL VALV · RFP · Due Dec 18, 2026
- SEALING MACHINE · RFP · Due Nov 30, 2026
- FLANGE,PIPE · RFP · Due Dec 18, 2026
- 12--PERISCOPE SUBASSEMB, IN REPAIR/MODIFICATION OF · RFP · Due Dec 22, 2026
- 28--BLADE,COMPRESSOR,AI, IN REPAIR/MODIFICATION OF · RFP · Due Dec 7, 2026
- 61--MOTOR,ALTERNATING C, IN REPAIR/MODIFICATION OF · RFP · Due Dec 22, 2026
- 66--INERTIAL MEASURING, IN REPAIR/MODIFICATION OF · RFP · Due Dec 7, 2026
- VALVE,BTFLY 4-IN · RFP · Due Nov 23, 2026
- 93--HEAD WINDOW ASSY · RFP · Due Nov 25, 2026
- SHAFT, WORM · RFP · Due Dec 7, 2026
- TEST SET, SURGE PRO · RFP · Due Dec 4, 2026
- CIRCUIT CARD ASSEMB · RFP · Due Dec 30, 2026
- CIRCUIT CARD ASSEMB · RFP · Due Dec 30, 2026
- PIN,INDEX AFT · RFP · Due Dec 7, 2026
- STEERING WHEEL · RFP · Due Nov 20, 2026
- POTASSIUM CRO4, 8% · RFP · Due Dec 7, 2026
- 48--VALVE,STOP-CHECK · RFP · Due Nov 30, 2026
- 61--CABLE ASSEMBLY,SPEC · RFP · Due Dec 7, 2026
- 70--DISPLAY UNIT, IN REPAIR/MODIFICATION OF · RFP · Due Dec 7, 2026
- METER,FLUID FLOW IN · RFP · Due Dec 7, 2026
- 61--FUSE BLK/EMI A11, IN REPAIR/MODIFICATION OF · RFP · Due Dec 7, 2026
- PWA DIFF MODE INDCT · RFP · Due Nov 20, 2026
- 47--FLANGE,PIPE · RFP · Due Dec 7, 2026
- 61--BATTERY ASSEMBLY, IN REPAIR/MODIFICATION OF · RFP · Due Dec 7, 2026
- VALVE,CHECK · RFP · Due Dec 7, 2026
- AMPLIFIER,AUDIO FRE · RFP · Due Dec 4, 2026
- 5-year, Long Term, Multiple Award, Indefinite-Delivery, Indefinite-Quantity Procurement Contract · RFP · Due Dec 21, 2026
- Sources Sought - Basic Ordering Agreement - Maritime · RFP · Due Nov 20, 2026
- WRENCH,SPANNER · RFP · Due Dec 7, 2026
- 48--VALVE,GATE · RFP · Due Dec 7, 2026
- RING,EXTERNALLY THR · RFP · Due Dec 7, 2026
- I.D. PLATE · RFP · Due Dec 7, 2026
- 48--VALVE,VENT, IN REPAIR/MODIFICATION OF · RFP · Due Dec 4, 2026
- 53--PLATE,MOUNTING · RFP · Due Dec 7, 2026
- 59--LOWER HMI PANEL ASS, IN REPAIR/MODIFICATION OF · RFP · Due Dec 7, 2026
- 70--KEYBOARD,DATA ENTRY, IN REPAIR/MODIFICATION OF · RFP · Due Dec 7, 2026
- 61--POWER SUPPLY, IN REPAIR/MODIFICATION OF · RFP · Due Dec 7, 2026
- 59--CIRCUIT CARD ASSEMB, IN REPAIR/MODIFICATION OF · RFP · Due Nov 23, 2026
- IMU, SDI · RFP · Due Dec 2, 2026
- 10--BARREL,SUBCALIBER G, IN REPAIR/MODIFICATION OF · RFP · Due Dec 11, 2026
- CARTRIDGE, EDGE TY · RFP · Due Nov 30, 2026
- 1355-01-620-4752 CWRT Wire Coil, Short · RFP · Due Nov 23, 2026
- 70--KEYBOARD,DATA ENTRY, IN REPAIR/MODIFICATION OF · RFP · Due Dec 7, 2026
- BUTTERFLY VLV 3.00 · RFP · Due Dec 7, 2026
- VACUUM PUMP UNIT · RFP · Due Dec 2, 2026
- VANE,LARGE · RFP · Due Dec 2, 2026
- 47--FLANGE,PIPE · RFP · Due Dec 7, 2026
- ANALOG BOARD · RFP · Due Dec 4, 2026
- 30--CYLINDER ASSEMBLY,A · RFP · Due Dec 7, 2026
- 48--VALVE,VENT, IN REPAIR/MODIFICATION OF · RFP · Due Dec 4, 2026
- HOSE ASSEMBLY · RFP · Due Nov 20, 2026
- 58--CTRL P/S C11690A, IN REPAIR/MODIFICATION OF · RFP · Due Dec 21, 2026
- 30--CYLINDER ASSEMBLY,A · RFP · Due Dec 7, 2026
- 48--DISK,VALVE, IN REPAIR/MODIFICATION OF · RFP · Due Dec 4, 2026
- 35--SEALING MACHINE · RFP · Due Dec 7, 2026
- METER,SPECIAL SCALE · RFP · Due Nov 20, 2026
- 59--LOWER HMI PANEL ASS, IN REPAIR/MODIFICATION OF · RFP · Due Dec 7, 2026
- 58--TUNER,RADIO FREQUEN, IN REPAIR/MODIFICATION OF · RFP · Due Dec 7, 2026
- HOSE ASSY,20 FT · RFP · Due Nov 20, 2026
- 62--FIXTURE,LED LIGHT · RFP · Due Nov 27, 2026
- 53--SCREW,CAP,SOCKET HE · RFP · Due Dec 7, 2026
- 48--VALVE, BUTTERFLY · RFP · Due Dec 21, 2026
- SWITCH · RFP · Due Dec 7, 2026
- 59--CIRCUIT CARD ASSY · RFP · Due Dec 7, 2026
- 10--BARREL,SUBCALIBER G, IN REPAIR/MODIFICATION OF · RFP · Due Dec 11, 2026
- GUIDE ROLLER ASSY · RFP · Due Nov 20, 2026
- 48--DISK,VALVE, IN REPAIR/MODIFICATION OF · RFP · Due Dec 4, 2026
- AMLCD,19 INCH · RFP · Due Nov 24, 2026
- CYLINDER ASSEMBLY · RFP · Due Dec 4, 2026
- 35--SEALING MACHINE · RFP · Due Dec 7, 2026
- PLATE,MOUNTING · RFP · Due Dec 4, 2026
- 70--KEYBOARD,DATA ENTRY, IN REPAIR/MODIFICATION OF · RFP · Due Dec 7, 2026
- 58--FAIRLEAD COVER · RFP · Due Dec 4, 2026
- LOWER HMI PANEL ASS · RFP · Due Dec 4, 2026
- 66--INERTIAL MEASURING · RFP · Due Dec 3, 2026
- 53--PLATE,MOUNTING · RFP · Due Dec 7, 2026
- 58--TUNER,RADIO FREQUEN, IN REPAIR/MODIFICATION OF · RFP · Due Dec 7, 2026
- VALVE,BALL · RFP · Due Dec 1, 2026
- DISPLAY,SMALL · RFP · Due Dec 4, 2026
- 48--VALVE,RELIEF,PRESSU · RFP · Due Nov 27, 2026
- 66--INERTIAL MEASURING · RFP · Due Dec 3, 2026
- GLAND,ACTUATOR · RFP · Due Nov 27, 2026
- NUT · RFP · Due Dec 4, 2026
- 61--POWER SUPPLY, IN REPAIR/MODIFICATION OF · RFP · Due Dec 7, 2026
- 48--RETAINER,DISK,VALVE · RFP · Due Nov 23, 2026
- TOWED ARRAY SUBASEM · RFP · Due Dec 4, 2026
- RECEIVER-TRANSMITTE · RFP · Due Dec 23, 2026
- SEALING MACHINE · RFP · Due Nov 30, 2026
- INTERFACE UNIT,DATA · RFP · Due Dec 4, 2026
- 48--VALVE,RELIEF,PRESSU · RFP · Due Nov 27, 2026
- CARRIER,WEAPONS · RFP · Due Nov 25, 2026
- ELECTRONIC COMPONEN · RFP · Due Nov 24, 2026
- 59--CIRCUIT CARD ASSY · RFP · Due Dec 7, 2026
- 61--CAPSTAN VAR SP CTRL · RFP · Due Dec 7, 2026
- INERTIAL NAVIGATION · RFP · Due Dec 4, 2026
- 59--DISPLAY,OPTOELECTRO, IN REPAIR/MODIFICATION OF · RFP · Due Dec 4, 2026
- 61--SWITCH ASSEMBLY · RFP · Due Dec 21, 2026
- PLATE,MOUNTING · RFP · Due Dec 4, 2026
- 59--SWITCH, ROTARY · RFP · Due Dec 7, 2026
- BOLT,THRUST NEUTRAL · RFP · Due Dec 4, 2026
- 43--FILTER ELEMENT,FLUI · RFP · Due Dec 5, 2026
- 59--CIRCUIT CARD ASSEMB, IN REPAIR/MODIFICATION OF · RFP · Due Dec 7, 2026
- CIRCUIT CARD ASSEMB · RFP · Due Dec 4, 2026
- 43--ROUGHING PUMP, IN REPAIR/MODIFICATION OF · RFP · Due Dec 7, 2026
- CABLE ASSEMBLY,SPEC · RFP · Due Nov 30, 2026
- KOH CARTRIDGE · RFP · Due Dec 3, 2026
- RADIAL SENSOR ASSY · RFP · Due Dec 3, 2026
- 59--SWITCH, ASSEMBLY · RFP · Due Dec 21, 2026
- HOSE, NONMETALLIC · RFP · Due Dec 3, 2026
- 61--CONTACTOR,MAGNETIC · RFP · Due Dec 3, 2026
- 53--SCREW,MACHINE · RFP · Due Dec 30, 2026
- POWER SUPPLY · RFP · Due Nov 29, 2026
- COUPLING,SHAFT,FLEX · RFP · Due Dec 3, 2026
- 59--CABLE ASSEMBLY · RFP · Due Nov 23, 2026
- CONN,SHIPSCABLE · RFP · Due Nov 20, 2026
- 2-TON CHAIN HOIST · RFP · Due Dec 2, 2026
- 61-Wiring Harness · RFP · Due Dec 3, 2026
- SWITCHBOARD ALARM · RFP · Due Dec 2, 2026
- VALVE, BUTTERFLY · RFP · Due Dec 3, 2026
- 48--VALVE,RELIEF,PRESSU · RFP · Due Dec 3, 2026
- WEDGE,SP · RFP · Due Nov 24, 2026
- VALVE, GLOBE W/ ACT · RFP · Due Nov 25, 2026
- DISC AND RING · RFP · Due Dec 2, 2026
- VALVE,CHECK · RFP · Due Nov 30, 2026
- VALVE, GLOBE W/ ACT · RFP · Due Nov 25, 2026
- VALVE,CHECK · RFP · Due Nov 30, 2026
- POWER SUPPLY · RFP · Due Dec 4, 2026
- 59--CABLE ASSEMBLY SET · RFP · Due Nov 30, 2026
- PIPE, SML, 2.50IN · RFP · Due Nov 30, 2026
- 58--HYDROPHONE ASSEMBLY- AND SIMILAR REPLACEMENT PARTS · RFP · Due Nov 30, 2026
- SHIM SET · RFP · Due Nov 30, 2026
- 61--CABLE ASSEMBLY,SPEC · RFP · Due Nov 20, 2026
- PUMP ASSY, PLUNGER · RFP · Due Nov 30, 2026
- VENT PLUG ASSEMBLY · RFP · Due Nov 30, 2026
- 59--ELECTRODE · RFP · Due Nov 27, 2026
- 48--VALVE, SOL 3-WAY · RFP · Due Nov 30, 2026
- GASKET, EMI · RFP · Due Nov 30, 2026
- COUPLING,SHAFT,FLEX · RFP · Due Nov 30, 2026
- CYLINDER,COMPRESSED · RFP · Due Nov 20, 2026
- 43--FILTER AIR ASSEMBLY · RFP · Due Dec 15, 2026
- 61--CONTACTOR,MAGNETIC · RFP · Due Dec 1, 2026
- 48--VALVE,RELIEF,PRESSU · RFP · Due Dec 1, 2026
- 13--RING,CLAMPING · RFP · Due Nov 30, 2026
- P7170 AES SYS RADIO · RFP · Due Nov 30, 2026
- 59--CIRCUIT CARD ASSEMB, IN REPAIR/MODIFICATION OF · RFP · Due Nov 30, 2026
- PARTS KIT,BALL VALV · RFP · Due Dec 4, 2026
- PLATE,MOUNTING · RFP · Due Nov 30, 2026
- 13--RING,CLAMPING · RFP · Due Nov 30, 2026
- HOUSING,LOADER,AFT · RFP · Due Nov 20, 2026
- STR FLG END FTG · RFP · Due Nov 30, 2026
- MODULE,TEMP ALARM · RFP · Due Nov 30, 2026
- CIRCUIT CARD ASSEMB · RFP · Due Nov 30, 2026
- POWER SUPPLY · RFP · Due Dec 29, 2026
- REMOVABLE CONE,SPEC · RFP · Due Nov 30, 2026
- PARTS KIT,BALL VALV · RFP · Due Nov 20, 2026
- BEARING ASSY, SPCL · RFP · Due Nov 30, 2026
- SWITCH CONNECT ASSY · RFP · Due Nov 27, 2026
- 93--SHEET,RUBBER · RFP · Due Nov 30, 2026
- BLOCK ASSEMBLY · RFP · Due Nov 30, 2026
- TAC COM AND AUDIO S · RFP · Due Nov 30, 2026
- STRAINER,SEDIMENT · RFP · Due Nov 30, 2026
- 66--TRANSDUCER,MOTIONAL · RFP · Due Nov 30, 2026
- 48--VALVE,STOP-CHECK · RFP · Due Nov 30, 2026
- 31--BEARING,BALL,ANNULA · RFP · Due Dec 8, 2026
- 59--CIRCUIT CARD ASSEMB, IN REPAIR/MODIFICATION OF · RFP · Due Dec 14, 2026
- 48--ACTUATOR,HYDRAULIC-, IN REPAIR/MODIFICATION OF · RFP · Due Nov 30, 2026
- 53--NUT,SELF-LOCKING,HE · RFP · Due Nov 30, 2026
- 31--BEARING,BALL,DUPLEX · RFP · Due Dec 1, 2026
- STEM, VALVE · RFP · Due Nov 30, 2026
- 47--CONNECTION,FLEXIBLE · RFP · Due Dec 14, 2026
- 53--NUT,SELF-LOCKING,HE · RFP · Due Nov 30, 2026
- VALVE STEM, TTV · RFP · Due Nov 30, 2026
- NRP,KEYBOARD,DATA E · RFP · Due Dec 28, 2026
- POWER SUPPLY · RFP · Due Nov 30, 2026
- 31--BEARING,BALL,DUPLEX- AND SIMILAR REPLACEMENT PARTS · RFP · Due Dec 2, 2026
- 47--CONNECTION,FLEXIBLE · RFP · Due Dec 14, 2026
- 48--VALVE,LINEAR,DIRECT · RFP · Due Dec 14, 2026
- BOLT,MACHINE · RFP · Due Nov 24, 2026
- 59--CABLE ASSEMBLY SET · RFP · Due Nov 30, 2026
- SCREW,CAP,HEXAGON H · RFP · Due Dec 14, 2026
- UPPER HMI PANEL ASS · RFP · Due Nov 30, 2026
- 66--REAGENT POWDER · RFP · Due Nov 30, 2026
- 66--TRANSDUCER,MOTIONAL · RFP · Due Nov 30, 2026
- PARTS KIT,BALL VALV · RFP · Due Nov 30, 2026
- 93--SHEET,RUBBER · RFP · Due Nov 30, 2026
- BULKHEAD · RFP · Due Nov 27, 2026
- 48--MANIFOLD ASSEMBLY - AND SIMILAR REPLACEMENT PARTS, IN REPAIR/MODIFICATION OF · RFP · Due Nov 20, 2026
- STEM,FLUID VALVE · RFP · Due Nov 26, 2026
- MANIFOLD ASSEMBLY · RFP · Due Nov 27, 2026
- SCREW CAPTIVE · RFP · Due Nov 27, 2026
- VALVE,BALL · RFP · Due Nov 26, 2026
- 13--CASE,AFTERBODY TORP · RFP · Due Dec 14, 2026
- NUT,SELF-LOCKING,HE · RFP · Due Nov 27, 2026
- AMPLIFIER,RADIO FRE · RFP · Due Nov 27, 2026
- DISK DRIVE UNIT · RFP · Due Dec 4, 2026
- POWER SUPPLY · RFP · Due Nov 27, 2026
- 43--PUMP UNIT,CENTRIFUG, IN REPAIR/MODIFICATION OF · RFP · Due Nov 27, 2026
- PARTS KIT BALL VALV · RFP · Due Nov 27, 2026
- 31--BEARING,BALL,ANNULA · RFP · Due Dec 8, 2026
- POWER SUPPLY · RFP · Due Dec 15, 2026
- 59--SWITCH · RFP · Due Nov 27, 2026
- TRANSMITTER,PRESSUR · RFP · Due Nov 30, 2026
- ACTUATOR,ELECTRO-ME · RFP · Due Nov 27, 2026
- 31--BEARING,BALL,DUPLEX- AND SIMILAR REPLACEMENT PARTS · RFP · Due Dec 3, 2026
- 59--CABLE ASSEMBLY,SPEC · RFP · Due Nov 27, 2026
- N0010427QX074 · RFP · Due Dec 18, 2026
- PARTS KIT,BALL VALV · RFP · Due Nov 20, 2026
- KITE TERMINAL BUKHD · RFP · Due Nov 30, 2026
- TORQUE ASSIST ASSEM · RFP · Due Dec 4, 2026
- 31--BEARING,BALL,DUPLEX- AND SIMILAR REPLACEMENT PARTS · RFP · Due Dec 2, 2026
- CAP,VALVE · RFP · Due Nov 26, 2026
- PARTS KIT,BALL VALV · RFP · Due Nov 26, 2026
- 31--BEARING,BALL,DUPLEX- AND SIMILAR REPLACEMENT PARTS · RFP · Due Dec 2, 2026
- WASHER,FLAT · RFP · Due Nov 27, 2026
- N0010427QK004 6135-01-646-5986 GWAX Sonar MK87 Mod 5 · RFP · Due Nov 30, 2026
- 49--TEST SET SUBASSEMBL, IN REPAIR/MODIFICATION OF · RFP · Due Nov 27, 2026
- 61--CABLE ASSEMBLY,SPEC · RFP · Due Nov 27, 2026
- VALVE,BREATHING APP · RFP · Due Nov 27, 2026
- 59--TRANSFORMER,POWER · RFP · Due Dec 14, 2026
- INSERT,BODY,VALVE · RFP · Due Nov 26, 2026
- VALVE,CHECK · RFP · Due Nov 27, 2026
- TRANSMITTER,PRESSUR · RFP · Due Nov 30, 2026
- FAN,TUBEAXIAL · RFP · Due Nov 25, 2026
- TELEPHONE TERMINAL · RFP · Due Nov 30, 2026
- 59--CABLE ASSEMBLY,SPEC · RFP · Due Nov 27, 2026
- 43--PUMP/MOTOR ASSY · RFP · Due Nov 27, 2026
- CABLE ASSEMBLY,SPEC · RFP · Due Nov 27, 2026
- SEGMENT #7 STERN · RFP · Due Nov 27, 2026
- 59--COIL,RADIO FREQUENC · RFP · Due Dec 14, 2026
- DISK ASSEMBLY,FLUID · RFP · Due Dec 15, 2026
- PILOT VALVE · RFP · Due Nov 27, 2026
- VALVE,GLOBE · RFP · Due Nov 27, 2026
- 45--COMPACTOR,REFUSE · RFP · Due Dec 3, 2026
- 59--ELECTRODE · RFP · Due Nov 27, 2026
- PLUG,TUBE FITTING,T · RFP · Due Nov 30, 2026
- 48--MANIFOLD ASSEMBLY - AND SIMILAR REPLACEMENT PARTS, IN REPAIR/MODIFICATION OF · RFP · Due Nov 20, 2026
- 61--BATTERY ASSEMBLY, IN REPAIR/MODIFICATION OF · RFP · Due Dec 14, 2026
- 20--TRAILING EDGE · RFP · Due Dec 1, 2026
- 48--ACTUATOR,HYDRAULIC-, IN REPAIR/MODIFICATION OF · RFP · Due Nov 30, 2026
- 31--BEARING,BALL,ANNULA · RFP · Due Dec 2, 2026
- PARTS KIT,BALL VALV · RFP · Due Nov 27, 2026
- 43--PUMP UNIT,CENTRIFUG, IN REPAIR/MODIFICATION OF · RFP · Due Nov 27, 2026
- GLAND,ACTUATOR · RFP · Due Nov 27, 2026
- SEAL RING,NUCLEAR C · RFP · Due Nov 27, 2026
- TRANSMITTER,PRESSUR · RFP · Due Nov 30, 2026
- MOTOR,ALTERNATING C · RFP · Due Nov 27, 2026
- 43--ELECTRLSIS 170 SCF, IN REPAIR/MODIFICATION OF · RFP · Due Dec 14, 2026
- PARTS KIT,BALL VALV · RFP · Due Nov 26, 2026
- FILTER UNIT,AIR PUR · RFP · Due Nov 27, 2026
- STUFFING BOX ASSEMB · RFP · Due Nov 27, 2026
- 31--BEARING,BALL,DUPLEX · RFP · Due Dec 1, 2026
- STEM ASSY · RFP · Due Nov 26, 2026
- ROTOR TORPEDO · RFP · Due Nov 27, 2026
- ACCELEROMETER,MECHA · RFP · Due Nov 27, 2026
- 31--BEARING,BALL,ANNULA · RFP · Due Dec 1, 2026
- PARTS KIT,BALL VALV · RFP · Due Nov 26, 2026
- 59--PRINTED CIRCUIT BOA · RFP · Due Dec 11, 2026
- 36--ECG REFURBISH KIT · RFP · Due Dec 11, 2026
- 45--COMPACTOR,REFUSE · RFP · Due Dec 3, 2026
- 61--CABLE ASSY BTC · RFP · Due Nov 30, 2026
- 20--PRAIRIE AIR,STBD, IN REPAIR/MODIFICATION OF · RFP · Due Nov 30, 2026
- 30--ADAPTER,HOUSING · RFP · Due Dec 11, 2026
- 48--VLV, REGUL PRESSURE · RFP · Due Dec 11, 2026
- 31--BEARING,BALL,DUPLEX- AND SIMILAR REPLACEMENT PARTS · RFP · Due Dec 3, 2026
- 31--BEARING,BALL,DUPLEX- AND SIMILAR REPLACEMENT PARTS · RFP · Due Dec 2, 2026
- CAMERA SYSTEM,SURVE · RFP · Due Nov 27, 2026
- 59--SWITCH · RFP · Due Nov 27, 2026
- 20--PRAIRIE AIR,STBD, IN REPAIR/MODIFICATION OF · RFP · Due Nov 30, 2026
- 20--WINDOW ASSEMBLY,HEA · RFP · Due Dec 10, 2026
- N0010427QX072 · RFP · Due Nov 20, 2026
- 20--TRAILING EDGE · RFP · Due Dec 1, 2026
- CIRCUIT CARD ASSEMB · RFP · Due Nov 27, 2026
- SPRING,HELICAL,COMP · RFP · Due Nov 30, 2026
- CCA,COMPUTER · RFP · Due Dec 18, 2026
- 59--SENSOR SYSTEM, THER, IN REPAIR/MODIFICATION OF · RFP · Due Dec 14, 2026
- 48--VALVE,GLOBE · RFP · Due Nov 30, 2026
- 47--1.5"BASKET STRAINER · RFP · Due Dec 11, 2026
- XMITTER,PRECSIONTRM · RFP · Due Nov 23, 2026
- 48--STEM-DISC ASSY · RFP · Due Nov 27, 2026
- 36--CHLORINATOR, ECG · RFP · Due Dec 11, 2026
- 31--BEARING,BALL,ANNULA · RFP · Due Dec 2, 2026
- 59--CHASSIS,ELECTRICAL-, IN REPAIR/MODIFICATION OF · RFP · Due Dec 10, 2026
- 31--BEARING,BALL,ANNULA · RFP · Due Dec 1, 2026
- 3HD 3040 017330673 D5, SHAFT · RFP · Due Nov 20, 2026
- 53--ANODE ASSY15-1,3.0 · RFP · Due Nov 23, 2026
- CB SAFETY DEV GEN 2 · RFP · Due Nov 23, 2026
- POWER SUPPLY, UNINT · RFP · Due Nov 23, 2026
- 58--TELEPHONE, IN REPAIR/MODIFICATION OF · RFP · Due Nov 23, 2026
- POWER SUPPLY · RFP · Due Nov 24, 2026
- BATTERY POWER SUPPL · RFP · Due Nov 23, 2026
- COOLER,FLUID,INDUST · RFP · Due Nov 23, 2026
- 48--VALVE,REGULATING,FL · RFP · Due Nov 23, 2026
- 3HD 5365 017330665 D5, BUSHING SLEEVE · RFP · Due Nov 30, 2026
- 3HD 5365 017330818 D5, BUSHING SLEEVE · RFP · Due Nov 23, 2026
- 48--GUIDE,VALVE STEM · RFP · Due Dec 3, 2026
- 48--GUIDE,VALVE STEM · RFP · Due Dec 3, 2026
- STEM,FLUID VALVE · RFP · Due Nov 23, 2026
- 1 HP MOTOR · RFP · Due Nov 23, 2026
- 31--SHELL, BEARING UP. · RFP · Due Nov 24, 2026
- 59--RELAY ASSEMBLY, IN REPAIR/MODIFICATION OF · RFP · Due Dec 8, 2026
- 59--ELECTRONIC COMPONEN, IN REPAIR/MODIFICATION OF · RFP · Due Dec 7, 2026
- 58--DOME,SONAR · RFP · Due Dec 7, 2026
- 47--HOSE ASSEMBLY,NONME · RFP · Due Dec 7, 2026
- 48--VALVE REGULATING SY, IN REPAIR/MODIFICATION OF · RFP · Due Nov 20, 2026
About DEPT OF DEFENSE.DEPT OF THE NAVY.NAVSUP.NAVSUP WEAPON SYSTEMS SUPPORT.NAVSUP WSS MECHANICSBURG.NAVSUP WEAPON SYSTEMS SUPPORT MECH
Find the latest government contracts, RFPs (Request for Proposals), and bidding opportunities from DEPT OF DEFENSE.DEPT OF THE NAVY.NAVSUP.NAVSUP WEAPON SYSTEMS SUPPORT.NAVSUP WSS MECHANICSBURG.NAVSUP WEAPON SYSTEMS SUPPORT MECH. Our database is updated daily with new solicitations and contract opportunities.
Whether you're a small business or an established government contractor, Narwin.ai provides the tools and AI-powered insights you need to find and win contracts from DEPT OF DEFENSE.DEPT OF THE NAVY.NAVSUP.NAVSUP WEAPON SYSTEMS SUPPORT.NAVSUP WSS MECHANICSBURG.NAVSUP WEAPON SYSTEMS SUPPORT MECH.