DEPT OF DEFENSE.DEFENSE LOGISTICS AGENCY.DLA MARITIME.DLA MARITIME COLUMBUS.DLA WEAPONS SUPPORT, Ohio
DEPT OF DEFENSE.DEFENSE LOGISTICS AGENCY.DLA MARITIME.DLA MARITIME COLUMBUS.DLA WEAPONS SUPPORT is a public-sector buyer in Ohio. Narwin currently lists 500 open tenders from this agency, each with its solicitation type and due date. The list below is the set of open notices, separate from the source portal.
Advanced Search500 Active Opportunities
Page 1 of 1- 59--CUSHION,EAR · RFP · Due Dec 4, 2026
- 59--ANTENNA · RFP · Due Nov 30, 2026
- 47--COUPLING,TUBE · RFP · Due Dec 4, 2026
- 48--VALVE,CHECK · RFP · Due Nov 30, 2026
- 61--CONTACTOR,MAGNETIC · RFP · Due Nov 30, 2026
- 47--HOSE,AIR DUCT · RFP · Due Nov 30, 2026
- 61--MOTOR,ALTERNATING CURR · RFP · Due Nov 30, 2026
- 59--TRANSFORMER,POWER · RFP · Due Nov 30, 2026
- 43--PUMP,ROTARY · RFP · Due Nov 30, 2026
- 48--VALVE,SAFETY RELIEF · RFP · Due Nov 30, 2026
- 59--ELECTRONIC COMPONENTS · RFP · Due Nov 30, 2026
- 59--RESISTOR,THERMAL · RFP · Due Nov 30, 2026
- 47--ELBOW,PIPE · RFP · Due Nov 30, 2026
- 25--SUPPORT,RETRACTABLE,TR · RFP · Due Nov 30, 2026
- 53--NUT,SELF-LOCKING,HE · RFP · Due Nov 30, 2026
- 43--PUMP UNIT,CENTRIFUGAL · RFP · Due Nov 25, 2026
- 48--VALVE,GLOBE · RFP · Due Nov 30, 2026
- 43--COVER,HYDRAULIC,PUMP-M · RFP · Due Nov 30, 2026
- 59--CIRCUIT CARD ASSEMBLY · RFP · Due Nov 30, 2026
- 43--HEAD,PUMP · RFP · Due Nov 30, 2026
- 53--SEAL,PLAIN · RFP · Due Nov 30, 2026
- 59--COIL,ELECTRICAL · RFP · Due Nov 30, 2026
- 59--SOLENOID,ELECTRICAL · RFP · Due Nov 30, 2026
- 59--SYNCHRO,TRANSMITTER · RFP · Due Nov 30, 2026
- 59--GPS NUMBER TWO,S,AI · RFP · Due Dec 4, 2026
- 20--PANEL FLOOR SECTION,WA · RFP · Due Nov 30, 2026
- 20--CHAIR,BARBER · RFP · Due Nov 30, 2026
- 43--FILTER ELEMENT,FLUID · RFP · Due Nov 30, 2026
- 43--SEAL ASSEMBLY,SHAFT,SP · RFP · Due Nov 30, 2026
- 61--PANEL,POWER DISTRIBUTI · RFP · Due Nov 30, 2026
- 48--VALVE,SOLENOID · RFP · Due Nov 30, 2026
- 48--VALVE,BALL · RFP · Due Nov 30, 2026
- 47--TUBE ASSEMBLY SET,META · RFP · Due Nov 30, 2026
- 48--VALVE,CROSSFEED FUEL · RFP · Due Nov 30, 2026
- 43--FILTER ELEMENT,FLUID · RFP · Due Nov 30, 2026
- 47--HOSE ASSEMBLY,METALLIC · RFP · Due Nov 30, 2026
- 59--ANTENNA · RFP · Due Dec 4, 2026
- 48--VALVE,GATE · RFP · Due Nov 30, 2026
- 47--HOSE ASSEMBLY SET,NONM · RFP · Due Nov 30, 2026
- 59--TRANSFORMER,POWER AUTO · RFP · Due Nov 30, 2026
- 43--SEPARATOR,WATER,LIQUID · RFP · Due Nov 30, 2026
- 48--VALVE,SAFETY RELIEF · RFP · Due Nov 30, 2026
- 20--DECK DRAIN KIT · RFP · Due Nov 30, 2026
- 59--TRANSFORMER,ELECTRICAL · RFP · Due Nov 30, 2026
- 61--MOTOR,TORQUE · RFP · Due Nov 30, 2026
- 59--SWITCH,PUSH · RFP · Due Nov 30, 2026
- 66--MONITOR,VOLTAGE DEVIAT · RFP · Due Nov 30, 2026
- 43--FILTER,FLUID · RFP · Due Nov 30, 2026
- 48--VALVE ASSEMBLY,MANIFOL · RFP · Due Nov 30, 2026
- 61--MOTOR,ALTERNATING CURR · RFP · Due Nov 30, 2026
- 48--ACTUATOR,ELECTROMECHAN · RFP · Due Nov 30, 2026
- 59--ANTENNA · RFP · Due Nov 30, 2026
- 61--CABLE,SPECIAL PURPOSE, · RFP · Due Nov 30, 2026
- 59--SWITCH,THERMOSTATIC · RFP · Due Nov 30, 2026
- 41--VALVE PLATE,COMPRESSOR · RFP · Due Nov 30, 2026
- 30--GEAR,SPUR · RFP · Due Nov 30, 2026
- 59--ENCODER,SHAFT ANGLE TO · RFP · Due Nov 30, 2026
- 16--DISK,VALVE · RFP · Due Nov 30, 2026
- 48--VALVE,REGULATING,FLUID · RFP · Due Dec 7, 2026
- 43--PUMP,ROTARY · RFP · Due Nov 30, 2026
- 48--DIAPHRAGM,ACTUATOR VAL · RFP · Due Nov 30, 2026
- 12--COVER,FIRE CONTROL INS · RFP · Due Dec 4, 2026
- 43--PUMP,ROTARY · RFP · Due Nov 30, 2026
- 47--TUBE,METALLIC · RFP · Due Nov 30, 2026
- 41--FAN,CENTRIFUGAL · RFP · Due Nov 30, 2026
- 59--ANTENNA · RFP · Due Nov 30, 2026
- 47--TUBE ASSEMBLY,METAL · RFP · Due Nov 30, 2026
- 20--OIL SEAL RING,THRUST B · RFP · Due Nov 30, 2026
- 20--EMBEDDED FOAM · RFP · Due Nov 30, 2026
- 59--DIPLEXER · RFP · Due Dec 4, 2026
- 59--SWITCH,PUSH · RFP · Due Nov 30, 2026
- 43--PUMP UNIT,ROTARY · RFP · Due Nov 30, 2026
- 25--DOOR,HATCH,VEHICLE · RFP · Due Nov 30, 2026
- 48--VALVE ASSEMBLY,MANIFOL · RFP · Due Nov 30, 2026
- 59--ANTENNA · RFP · Due Nov 30, 2026
- 48--COCK,POPPET DRAIN · RFP · Due Nov 30, 2026
- 47--COUPLING ASSEMBLY,SELF · RFP · Due Nov 30, 2026
- 61--NRP,DC FAULT CARD A · RFP · Due Nov 30, 2026
- 48--DISK,VALVE · RFP · Due Nov 30, 2026
- 59--ANTENNA · RFP · Due Nov 30, 2026
- 48--VALVE,3 WAY · RFP · Due Nov 30, 2026
- 48--VALVE,SAFETY RELIEF · RFP · Due Nov 30, 2026
- 48--VALVE,CHECK · RFP · Due Nov 30, 2026
- 48--VALVE,SAFETY RELIEF · RFP · Due Nov 30, 2026
- 16--SPOOL AND SLEEVE ASSEM · RFP · Due Nov 30, 2026
- 47--HOSE ASSEMBLY,NONMETAL · RFP · Due Nov 30, 2026
- 49--REPAIR KIT,ELECTRICAL · RFP · Due Nov 30, 2026
- 43--CYLINDER BLOCK UNIT,HY · RFP · Due Nov 30, 2026
- 43--SEAL ASSEMBLY,SHAFT,SP · RFP · Due Nov 30, 2026
- 48--VALVE,CHECK · RFP · Due Nov 30, 2026
- 59--SONAR HEADSET · RFP · Due Nov 30, 2026
- 48--VALVE,SOLENOID · RFP · Due Nov 30, 2026
- 66--VOLTMETER · RFP · Due Nov 30, 2026
- 16--MANUAL CONTROL,HAND · RFP · Due Dec 4, 2026
- 43--PARTS KIT,ROTARY PUMP · RFP · Due Nov 30, 2026
- 59--LIGHT-SWITCH ASSEMBLY · RFP · Due Nov 30, 2026
- 48--VALVE,LINEAR,DIRECTION · RFP · Due Dec 7, 2026
- 48--VALVE,RELIEF,PRESSURE · RFP · Due Nov 30, 2026
- 16--POWER SUPPLY ASSEMB · RFP · Due Nov 30, 2026
- 59--CIRCUIT CARD ASSEMBLY · RFP · Due Nov 30, 2026
- 48--VALVE,BALL · RFP · Due Nov 30, 2026
- 43--FEED,AIR COMPRESSOR · RFP · Due Nov 30, 2026
- 48--VALVE,SAFETY RELIEF · RFP · Due Nov 30, 2026
- 48--VALVE,RELIEF,PRESSURE · RFP · Due Nov 30, 2026
- 48--VALVE,BALL · RFP · Due Nov 30, 2026
- 59--SWITCH ASSEMBLY · RFP · Due Nov 30, 2026
- 59--SEMICONDUCTOR DEVICE,D · RFP · Due Nov 30, 2026
- 48--SERVOVALVE,HYDRAULIC · RFP · Due Nov 30, 2026
- 61--GENERATOR,ALTERNATING · RFP · Due Nov 30, 2026
- 20--MOTOR,WINDSHIELD WIPER · RFP · Due Nov 30, 2026
- 47--STRAINER,SEDIMENT · RFP · Due Dec 4, 2026
- 66--TEST SET,TRANSPONDER S · RFP · Due Nov 30, 2026
- 48--DECK BOX,REMOTE OPERAT · RFP · Due Nov 30, 2026
- 59--ELECTRONIC COMPONENTS · RFP · Due Nov 30, 2026
- 48--VALVE,SOLENOID · RFP · Due Nov 30, 2026
- 59--SWITCH,BOX · RFP · Due Nov 30, 2026
- 59--SWITCH,PUSH · RFP · Due Nov 30, 2026
- 59--SWITCH,PULL · RFP · Due Nov 30, 2026
- 48--CARTRIGE,VALVE MANIFOL · RFP · Due Nov 30, 2026
- 48--STEM,FLUID VALVE · RFP · Due Nov 30, 2026
- 47--STRAINER,SEDIMENT · RFP · Due Nov 30, 2026
- 43--SCREEN,PUMP · RFP · Due Nov 30, 2026
- 48--VALVE,SOLENOID · RFP · Due Nov 30, 2026
- 48--VALVE,LINEAR,DIRECTION · RFP · Due Nov 30, 2026
- 61--CONTACTOR,MAGNETIC · RFP · Due Nov 30, 2026
- 47--COUPLING HALF,QUICK DI · RFP · Due Nov 30, 2026
- 43--EJECTOR,JET · RFP · Due Nov 30, 2026
- 47--COUPLING ASSEMBLY,TUBE · RFP · Due Nov 30, 2026
- 59--SWITCH,SENSITIVE · RFP · Due Nov 30, 2026
- 20--TOOL,COMPRESSION,STERN · RFP · Due Nov 30, 2026
- 48--VALVE,ANGLE · RFP · Due Nov 30, 2026
- 29--FILTER,FLUID · RFP · Due Nov 30, 2026
- 66--DETECTOR HEAD · RFP · Due Nov 30, 2026
- 59--COIL,ELECTRICAL · RFP · Due Nov 30, 2026
- 47--HOSE,AIR DUCT · RFP · Due Nov 30, 2026
- 59--CIRCUIT CARD ASSEMBLY · RFP · Due Nov 30, 2026
- 48--VALVE,SAFETY RELIEF · RFP · Due Nov 30, 2026
- 48--VALVE,SAFETY RELIEF · RFP · Due Nov 30, 2026
- 59--CONNECTOR,PLUG,ELECTRI · RFP · Due Nov 30, 2026
- 53--KIT,SEAL · RFP · Due Nov 30, 2026
- 53--PACKING ASSEMBLY · RFP · Due Nov 30, 2026
- 30--ROD,PISTON,LINEAR ACTU · RFP · Due Nov 30, 2026
- 48--ACTUATOR,ELECTROMECHAN · RFP · Due Nov 30, 2026
- 53--LATCH SET,MORTISE · RFP · Due Nov 30, 2026
- 43--PISTON,COMPRESSOR · RFP · Due Nov 30, 2026
- 59--ARM,SWITCH ACTUATOR · RFP · Due Nov 30, 2026
- 59--CONNECTOR,PLUG,ELECTRI · RFP · Due Nov 30, 2026
- 41--INDICATOR,MOISTURE-LIQ · RFP · Due Nov 30, 2026
- 20--CABLE ASSY,REVERSE · RFP · Due Nov 30, 2026
- 48--VALVE,CHECK,OXYGEN SYS · RFP · Due Nov 30, 2026
- 66--LEAD,TEST · RFP · Due Dec 4, 2026
- 59 - Switch, Solid State · RFP · Due Dec 2, 2026
- 47--CAP,QUICK DISCONNECT · RFP · Due Nov 30, 2026
- 47--CLAMP,HOSE · RFP · Due Nov 30, 2026
- 59--SWITCH,PRESSURE · RFP · Due Nov 30, 2026
- 59--CONNECTOR BODY,PLUG,EL · RFP · Due Nov 30, 2026
- 66--TRANSDUCER,MOTIONAL PI · RFP · Due Nov 30, 2026
- 48--VALVE ASSEMBLY,SOLENOI · RFP · Due Nov 30, 2026
- 47--ELBOW,TUBE · RFP · Due Nov 30, 2026
- 48--VALVE,BALL · RFP · Due Nov 30, 2026
- 43--RING,WEARING · RFP · Due Nov 30, 2026
- 59--SWITCH,PRESSURE · RFP · Due Nov 30, 2026
- 59--ANTENNA · RFP · Due Nov 30, 2026
- 48--ACTUATOR,HYDRAULIC · RFP · Due Nov 30, 2026
- 48--VALVE,SAFETY RELIEF · RFP · Due Nov 30, 2026
- 61--MOTOR,ALTERNATING CURR · RFP · Due Nov 30, 2026
- 47--HOSE ASSEMBLY,NONMETAL · RFP · Due Nov 30, 2026
- 48--ACTUATOR,ELECTROMECHAN · RFP · Due Nov 30, 2026
- 59--CIRCUIT CARD ASSEMBLY · RFP · Due Nov 30, 2026
- 59--SWITCH,ELECTRONIC · RFP · Due Nov 30, 2026
- 47--COUPLING,PIPE · RFP · Due Nov 30, 2026
- 20--PLATE,MOUNTING · RFP · Due Nov 30, 2026
- 59--CONNECTOR BODY,PLUG,EL · RFP · Due Nov 30, 2026
- 59--SEMICONDUCTOR DEVICE A · RFP · Due Nov 30, 2026
- 43--PUMP UNIT,ROTARY · RFP · Due Nov 30, 2026
- 43--PUMP UNIT,CENTRIFUGAL · RFP · Due Nov 30, 2026
- 59--CLAMP,CABLE,ELECTRICAL · RFP · Due Nov 30, 2026
- 59--SWITCH,SENSITIVE · RFP · Due Nov 30, 2026
- 59--MICROPHONE,CAPACITOR · RFP · Due Nov 30, 2026
- 43--FILTER ELEMENT,FLUID · RFP · Due Nov 30, 2026
- 59--NETWORK,CIRCUIT PROTEC · RFP · Due Nov 30, 2026
- 59--SWITCH,PUSH · RFP · Due Nov 30, 2026
- 59--SOLENOID,ELECTRICAL · RFP · Due Nov 30, 2026
- 43--FILTER ASSEMBLY,FLUID · RFP · Due Nov 30, 2026
- 48--STEM,FLUID VALVE · RFP · Due Nov 30, 2026
- 47--PIPE,DISCHARGE · RFP · Due Nov 30, 2026
- 48--VALVE,BALL · RFP · Due Nov 30, 2026
- 48--VALVE,CALIBRATED FLOW · RFP · Due Nov 30, 2026
- 43--CONTROL ASSEMBLY,OUTPU · RFP · Due Nov 30, 2026
- 59--COUPLER,ANTENNA · RFP · Due Nov 30, 2026
- 43--PUMP UNIT,CENTRIFUGAL · RFP · Due Nov 30, 2026
- 48--VALVE,SOLENOID · RFP · Due Nov 30, 2026
- 48--VALVE,SOLENOID · RFP · Due Nov 30, 2026
- 43--FILTER ELEMENT,FLUID · RFP · Due Nov 30, 2026
- 47--SWING JOINT,PIPE · RFP · Due Nov 30, 2026
- 47--STRAINER,SEDIMENT · RFP · Due Nov 30, 2026
- 59--TRANSFORMER,DISTRIB · RFP · Due Nov 30, 2026
- 59--CIRCUIT CARD ASSEMBLY · RFP · Due Nov 30, 2026
- 48--VALVE,SAFETY RELIEF · RFP · Due Nov 30, 2026
- 59--MICROCIRCUIT,DIGITAL · RFP · Due Nov 30, 2026
- 43--PLATE,WEAR,ROTARY PUMP · RFP · Due Nov 30, 2026
- 43--PARTS KIT,COMPRESSOR · RFP · Due Nov 30, 2026
- 59--RADOME · RFP · Due Nov 30, 2026
- 66--AMMETER · RFP · Due Nov 30, 2026
- 47--HOSE ASSEMBLY,NONMETAL · RFP · Due Nov 30, 2026
- 47--HOSE ASSEMBLY,NONMETAL · RFP · Due Nov 30, 2026
- 59--AMPLIFIED SPEAKER A · RFP · Due Nov 30, 2026
- 43--RESERVOIR,HYDRAULIC · RFP · Due Nov 30, 2026
- 59--COUPLER,DIRECTIONAL · RFP · Due Nov 30, 2026
- 59--CIRCUIT BREAKER · RFP · Due Dec 4, 2026
- 66--MULTIMETER · RFP · Due Nov 30, 2026
- 47--HOSE ASSEMBLY,NONMETAL · RFP · Due Nov 30, 2026
- 66--METER,ELECTRICAL FREQU · RFP · Due Nov 30, 2026
- 48--VALVE,REGULATING,TEMPE · RFP · Due Nov 30, 2026
- 59--SWITCH,SENSITIVE · RFP · Due Nov 30, 2026
- 59--LABEL,CLEAR · RFP · Due Nov 30, 2026
- 47--UNION,PIPE · RFP · Due Nov 30, 2026
- 59--RELAY,ELECTROMAGNETIC · RFP · Due Nov 30, 2026
- 59--ELECTRON TUBE · RFP · Due Nov 30, 2026
- 48--PARTS KIT,VALVE · RFP · Due Nov 30, 2026
- 59--LOUDSPEAKER ASSEMBLY · RFP · Due Nov 30, 2026
- 59--SWITCH,RADIO FREQUENCY · RFP · Due Nov 30, 2026
- 48--SEAT,VALVE · RFP · Due Nov 30, 2026
- 47--ADAPTER,STRAIGHT,TUBE · RFP · Due Nov 30, 2026
- 59--SWITCH HOUSING · RFP · Due Nov 30, 2026
- 48--VALVE,SERVO · RFP · Due Nov 30, 2026
- 47--HOSE,AIR DUCT · RFP · Due Nov 30, 2026
- 47--TUBE ASSEMBLY,METAL · RFP · Due Nov 30, 2026
- 61--MOTOR,ALTERNATING CURR · RFP · Due Nov 30, 2026
- 61--REGULATOR,VOLTAGE · RFP · Due Nov 30, 2026
- 43--FILTER UNIT,FLUID,PRES · RFP · Due Nov 30, 2026
- 43--PARTS KIT,COMPRESSOR · RFP · Due Nov 30, 2026
- 48--VALVE ASSEMBLY · RFP · Due Nov 30, 2026
- 59--CIRCUIT BREAKER · RFP · Due Nov 30, 2026
- 48--VALVE,ROTARY,SELECTOR · RFP · Due Nov 30, 2026
- 48--VALVE,GATE · RFP · Due Nov 30, 2026
- 47--STRAINER,SEDIMENT · RFP · Due Nov 30, 2026
- 48--VALVE,REGULATING,FLUID · RFP · Due Nov 30, 2026
- 61--MOTOR,ALTERNATING CURR · RFP · Due Nov 30, 2026
- 43--FILTER ELEMENT,FLUID · RFP · Due Nov 30, 2026
- 47--SWING JOINT,PIPE · RFP · Due Nov 30, 2026
- 48--ACTUATOR,ELECTROMECHAN · RFP · Due Nov 30, 2026
- 59--LOUDSPEAKER-AMPLIFIER · RFP · Due Dec 4, 2026
- 61--CABLE,SPECIAL PURPOSE, · RFP · Due Nov 30, 2026
- 43--COVER,HYDRAULIC,PUMP-M · RFP · Due Nov 30, 2026
- 43--EJECTOR,JET · RFP · Due Nov 30, 2026
- 59--SWITCH,ELECTRONIC · RFP · Due Nov 30, 2026
- 48--VALVE,CHECK · RFP · Due Nov 30, 2026
- 43--RING,PISTON · RFP · Due Nov 30, 2026
- 48--VALVE,SOLENOID · RFP · Due Nov 30, 2026
- 59--SOLENOID,ELECTRICAL · RFP · Due Nov 30, 2026
- 61--MOTOR,ALTERNATING CURR · RFP · Due Nov 30, 2026
- 43--PARTS KIT,SEDIMENT · RFP · Due Nov 30, 2026
- 48--VALVE,LINEAR,DIRECTION · RFP · Due Nov 30, 2026
- 47--PARTS KIT,LANYARD · RFP · Due Nov 30, 2026
- 48--PARTS KIT,CHECK VALVE · RFP · Due Nov 30, 2026
- 59--SWITCH,THERMOSTATIC · RFP · Due Nov 30, 2026
- 59--SWITCH,SLIDE · RFP · Due Nov 30, 2026
- 48--CAP,VALVE · RFP · Due Nov 30, 2026
- 48--VALVE,SOLENOID · RFP · Due Nov 30, 2026
- 43--VACUUM PUMP UNIT,DIFFU · RFP · Due Nov 30, 2026
- 59--COVER,ELECTRICAL CONNE · RFP · Due Nov 30, 2026
- 48--VALVE ASSEMBLY · RFP · Due Nov 30, 2026
- 48--VALVE,LINEAR,DIRECTION · RFP · Due Nov 30, 2026
- 47--HOSE ASSEMBLY,NONMETAL · RFP · Due Nov 30, 2026
- 47--HOSE ASSEMBLY,NONMETAL · RFP · Due Nov 30, 2026
- 59--CIRCUIT BREAKER · RFP · Due Nov 30, 2026
- 48--VALVE,BALL · RFP · Due Nov 30, 2026
- 20--WINDOW,MARINE · RFP · Due Nov 30, 2026
- 43--BOWL,SPINDLE · RFP · Due Nov 30, 2026
- 16--BUMPER,HOSE REEL · RFP · Due Dec 4, 2026
- 48--VALVE,SOLENOID · RFP · Due Jan 1, 2027
- 43--HOUSING,HYDRAULIC MOTO · RFP · Due Nov 30, 2026
- 48--VALVE,GATE · RFP · Due Nov 30, 2026
- 20--WINDSHIELD WIPER ASSEM · RFP · Due Nov 30, 2026
- 59--SWITCH,LIQUID LEVEL · RFP · Due Nov 30, 2026
- 61--MOTOR,ALTERNATING CURR · RFP · Due Nov 30, 2026
- 48--REGULATING ELEMENT,FLO · RFP · Due Nov 30, 2026
- 59--ELECTRONIC COMPONENTS · RFP · Due Nov 30, 2026
- 59--RESISTOR,VARIABLE,NONW · RFP · Due Nov 30, 2026
- 43--SEPARATOR,WATER,LIQUID · RFP · Due Nov 30, 2026
- 59--CIRCUIT CARD ASSEMBLY · RFP · Due Nov 30, 2026
- 59--SOLENOID,ELECTRICAL · RFP · Due Nov 30, 2026
- 59--CONNECTOR BODY,PLUG,EL · RFP · Due Nov 30, 2026
- 43--CYLINDER,ROTARY PUMP · RFP · Due Nov 30, 2026
- 47--HOSE SET,NONMETALL, · RFP · Due Nov 30, 2026
- 59--CIRCUIT CARD ASSEMBLY · RFP · Due Nov 30, 2026
- 43--COOLING BLOWER · RFP · Due Nov 30, 2026
- 59--RELAY,ELECTROMAGNETIC · RFP · Due Nov 30, 2026
- 59--TRANSFORMER,POWER AUTO · RFP · Due Nov 30, 2026
- 59--CABLE ASSY,AFT · RFP · Due Nov 30, 2026
- 20--ACCUMULATOR,HYDRAULIC · RFP · Due Nov 30, 2026
- 48--VALVE,ANGLE · RFP · Due Nov 30, 2026
- 43--SEAL ASSEMBLY,SHAFT,SP · RFP · Due Nov 30, 2026
- 47--TUBING,NONMETALLIC · RFP · Due Nov 30, 2026
- 43--HOUSING,LIQUID PUMP · RFP · Due Nov 30, 2026
- 48--VALVE,REGULATING,FLUID · RFP · Due Nov 30, 2026
- 48--VALVE,FLOAT · RFP · Due Nov 30, 2026
- 43--FILTER,FLUID · RFP · Due Nov 30, 2026
- 59--SWITCH,TOGGLE · RFP · Due Nov 30, 2026
- 59--RELAY,ELECTROMAGNETIC · RFP · Due Nov 30, 2026
- 47--COUPLING ASSEMBLY,SELF · RFP · Due Nov 30, 2026
- 59--WAVEGUIDE · RFP · Due Nov 30, 2026
- 48--VALVE,CHECK · RFP · Due Nov 30, 2026
- 59--EXTENDER CARD,ELECTRON · RFP · Due Nov 30, 2026
- 61--CONTACTOR,MAGNETIC · RFP · Due Nov 30, 2026
- 59--CONNECTOR,RECEPTACLE,E · RFP · Due Dec 4, 2026
- 47--ELBOW,FLANGE · RFP · Due Nov 30, 2026
- 48--VALVE,GATE · RFP · Due Nov 30, 2026
- 48--VALVE,SOLENOID · RFP · Due Nov 30, 2026
- 66--HOUSING,INDICATOR · RFP · Due Nov 30, 2026
- 48--STEM,FLUID VALVE · RFP · Due Nov 30, 2026
- 61--BRAKE,ELECTRIC · RFP · Due Nov 30, 2026
- 59--LOUDSPEAKER-CONTROL UN · RFP · Due Nov 30, 2026
- 59--SEMICONDUCTOR DEVICE S · RFP · Due Nov 30, 2026
- 59--SWITCH,TOGGLE · RFP · Due Nov 30, 2026
- 48--ACTUATOR,ELECTROMECHAN · RFP · Due Nov 30, 2026
- 47--HOSE ASSEMBLY,NONMETAL · RFP · Due Nov 30, 2026
- 59--ABSORBER,OVERVOLTAGE · RFP · Due Nov 30, 2026
- 47--COUPLING HALF,SELF-SEA · RFP · Due Nov 30, 2026
- 59--CONTACT,ELECTRICAL · RFP · Due Nov 30, 2026
- 47--COUPLING ASSEMBLY,SELF · RFP · Due Nov 30, 2026
- 53--RETAINER,PACKING · RFP · Due Nov 30, 2026
- 48--VALVE,SAFETY RELIEF · RFP · Due Nov 30, 2026
- 47--COUPLING HALF,QUICK DI · RFP · Due Nov 30, 2026
- 43--PISTON,COMPRESSOR · RFP · Due Nov 30, 2026
- 59--SWITCH,TOGGLE · RFP · Due Nov 30, 2026
- 53--O-RING · RFP · Due Nov 30, 2026
- 43--FILTER ELEMENT,FLUI · RFP · Due Nov 30, 2026
- 59--CUSHION,EAR · RFP · Due Dec 3, 2026
- 43--PARTS KIT,FLUID PRESSU · RFP · Due Nov 30, 2026
- 59--DUMMY LOAD,ELECTRICAL · RFP · Due Nov 27, 2026
- 59--CIRCUIT BREAKER · RFP · Due Nov 30, 2026
- 43--PUMPING UNIT,HYDRAU · RFP · Due Nov 30, 2026
- 48--VALVE,SOLENOID · RFP · Due Nov 30, 2026
- 43--FILTER ELEMENT,FLUID · RFP · Due Dec 3, 2026
- 30--LEVER,MANUAL CONTRO · RFP · Due Nov 30, 2026
- 59--RELAY,SOLID STATE · RFP · Due Dec 3, 2026
- 59--STRIP,ELECTRICAL GROUN · RFP · Due Dec 3, 2026
- 46--CARTRIDGE,WATER DEMINE · RFP · Due Dec 4, 2026
- 61--CONTROLLER,MOTOR · RFP · Due Nov 30, 2026
- 59--SWITCH,SENSITIVE · RFP · Due Nov 30, 2026
- 59--AMPLIFIER,RADIO FREQUE · RFP · Due Dec 3, 2026
- 59--SWITCH,SENSITIVE · RFP · Due Dec 3, 2026
- 20--MODIFICATION KIT,SHIP · RFP · Due Dec 3, 2026
- 59--ANTENNA · RFP · Due Dec 3, 2026
- 48--PISTON,VALVE · RFP · Due Nov 30, 2026
- 59--SHELL,ELECTRICAL CONNE · RFP · Due Dec 3, 2026
- 48--VALVE,CHECK · RFP · Due Dec 2, 2026
- 59--ADAPTER,CONNECTOR · RFP · Due Dec 2, 2026
- 59--SWITCH,SENSITIVE · RFP · Due Nov 30, 2026
- 16--MANIFOLD ASSEMBLY,HYDR · RFP · Due Dec 2, 2026
- 59--ACCESSORY KIT,ANTENNA · RFP · Due Dec 2, 2026
- 66 - Test Set, Electronic · RFP · Due Jan 14, 2027
- 16--BASE,OXYGEN CONCENTRAT · RFP · Due Dec 3, 2026
- 59--EARPHONE · RFP · Due Dec 2, 2026
- 48--SERVOVALVE,HYDRAULI · RFP · Due Nov 30, 2026
- 59--RADOME · RFP · Due Nov 27, 2026
- 59--CONNECTOR,PLUG,ELECTRI · RFP · Due Dec 2, 2026
- 59--SONAR HEADSET · RFP · Due Dec 2, 2026
- 43--RING,LANTERN · RFP · Due Nov 30, 2026
- 61--CABLE,POWER,ELECTRICAL · RFP · Due Nov 30, 2026
- 59--HEADSET-MICROPHONE · RFP · Due Dec 2, 2026
- 59--CONNECTOR,BULKHEAD,ELE · RFP · Due Nov 30, 2026
- 59--NRP,BOARD,PC,LOAD D · RFP · Due Dec 2, 2026
- 59--MICROPHONE,MAGNETIC · RFP · Due Nov 30, 2026
- 48--VALVE,SAFETY RELIEF · RFP · Due Nov 30, 2026
- 47--TUBE,METALLIC · RFP · Due Nov 23, 2026
- 48--VALVE,ROTARY,SELECTOR · RFP · Due Nov 30, 2026
- 59--ANTENNA · RFP · Due Dec 2, 2026
- 12--DRUM,RANGE · RFP · Due Dec 2, 2026
- 59--HANDSET · RFP · Due Dec 2, 2026
- 59--CAPACITOR,FIXED,METALL · RFP · Due Dec 2, 2026
- 49--VALVE,SPLINED · RFP · Due Dec 3, 2026
- 59--BOX,HANDSET STORAGE · RFP · Due Dec 2, 2026
- 48--CARTRIGE,VALVE MANIFOL · RFP · Due Nov 30, 2026
- 48--VALVE,GATE · RFP · Due Nov 30, 2026
- 47--REDUCER,PIPE · RFP · Due Nov 30, 2026
- 59--WIRE MESH,KNITTED · RFP · Due Dec 2, 2026
- 53--ARM DOG · RFP · Due Nov 30, 2026
- 59--HOUSING,ELECTRONIC COM · RFP · Due Nov 30, 2026
- 59--VARISTOR · RFP · Due Dec 2, 2026
- 59--ANTENNA SUBASSEMBLY · RFP · Due Dec 2, 2026
- 59--ADAPTER,CONNECTOR · RFP · Due Dec 2, 2026
- 43--SEAL ASSEMBLY,SHAFT · RFP · Due Nov 30, 2026
- 59--CONNECTOR,RECEPTACLE,E · RFP · Due Dec 2, 2026
- 59--SWITCH,LIQUID LEVEL · RFP · Due Dec 2, 2026
- 48--VALVE,SOLENOID · RFP · Due Nov 30, 2026
- 59--ANTENNA · RFP · Due Nov 30, 2026
- 59--ANTENNA SUBASSEMBLY · RFP · Due Dec 2, 2026
- 59--SWITCH,PRESSURE · RFP · Due Dec 2, 2026
- 43--SEAL ASSEMBLY,SHAFT,SP · RFP · Due Nov 30, 2026
- 59--ANTENNA · RFP · Due Dec 2, 2026
- 47--ELBOW,TUBE · RFP · Due Dec 3, 2026
- 59--ANTENNA · RFP · Due Dec 2, 2026
- 47--PLUG,CENTERING BEARING · RFP · Due Nov 30, 2026
- 59--STRIP,ELECTRICAL GROUN · RFP · Due Dec 2, 2026
- 43--PUMP,ROTARY · RFP · Due Nov 30, 2026
- 59--ANTENNA · RFP · Due Nov 30, 2026
- 47--COUPLING HALF,QUICK DI · RFP · Due Dec 3, 2026
- 59--ANTENNA · RFP · Due Dec 2, 2026
- 59--MICROPHONE,CAPACITOR · RFP · Due Dec 2, 2026
- 61--PANEL,CONTROL ASSEMBLY · RFP · Due Nov 27, 2026
- 59--AMPLIFIER,VIDEO · RFP · Due Dec 1, 2026
- 59--CONNECTOR,PLUG,ELECTRI · RFP · Due Dec 1, 2026
- 59--RELAY,ELECTROMAGNETIC · RFP · Due Dec 1, 2026
- 59--REFLECTOR SECTION,ANTE · RFP · Due Dec 1, 2026
- 59--FILTER,BAND PASS · RFP · Due Dec 1, 2026
- 59--CONNECTOR,RECEPTACLE,E · RFP · Due Dec 1, 2026
- 59--CIRCUIT CARD ASSEMBLY · RFP · Due Nov 27, 2026
- 48--VALVE,PLUG · RFP · Due Nov 27, 2026
- 66--PROBE,TEST · RFP · Due Nov 27, 2026
- 59--ABSORBER,OVERVOLTAGE · RFP · Due Dec 1, 2026
- 47--RESTRICTOR,FLUID FLOW · RFP · Due Nov 27, 2026
- 47--TUBE ASSEMBLY,METAL · RFP · Due Nov 27, 2026
- 48--VALVE,ANGLE · RFP · Due Nov 27, 2026
- 59--SHIELDING GASKET,ELECT · RFP · Due Dec 1, 2026
- 59--RELAY,ELECTROMAGNETIC · RFP · Due Dec 1, 2026
- 59--CONNECTOR,PLUG,ELECTRI · RFP · Due Dec 1, 2026
- 59--ADAPTER,ANTENNA TO ANT · RFP · Due Dec 1, 2026
- 59--BACKSHELL,ELECTRICAL C · RFP · Due Dec 1, 2026
- 59--ANTENNA · RFP · Due Dec 1, 2026
- 59--ATTENUATOR,VARIABLE · RFP · Due Dec 1, 2026
- 59--HOUSING,ELECTRONIC COM · RFP · Due Dec 1, 2026
- 66--TRANSDUCER,MOTIONAL PI · RFP · Due Dec 1, 2026
- 59--RELAY,ELECTROMAGNETIC · RFP · Due Dec 1, 2026
- 59--CONNECTOR,PLUG,ELECTRI · RFP · Due Dec 1, 2026
- 59--CABLE ASSY,AFT · RFP · Due Dec 1, 2026
- 59--RELAY,ELECTROMAGNETIC · RFP · Due Dec 1, 2026
- 59--BACKSHELL,ELECTRICAL C · RFP · Due Dec 1, 2026
- 59--COVER,ANTENNA SUPPORT · RFP · Due Dec 1, 2026
- 43--CYLINDER SLEEVE · RFP · Due Nov 27, 2026
- 59--ADAPTER,CONNECTOR · RFP · Due Dec 1, 2026
- 59--INCLINOMETER,ANTENNA · RFP · Due Dec 1, 2026
- 59--CONNECTOR,PLUG,ELECTRI · RFP · Due Dec 1, 2026
- 59--COOLER,AIR,ELECTRONIC · RFP · Due Dec 1, 2026
- 59--AMPLIFIER,RADIO FREQUE · RFP · Due Dec 1, 2026
- 59--RESISTOR,VARIABLE,WIRE · RFP · Due Dec 1, 2026
- 59--COVER,ELECTRICAL CONNE · RFP · Due Dec 1, 2026
- 59--FILTER,RADIO FREQUENCY · RFP · Due Dec 1, 2026
- 47--TUBE ASSEMBLY,METAL · RFP · Due Nov 27, 2026
- 59--COVER,RADOME · RFP · Due Dec 1, 2026
- 59--ANTENNA · RFP · Due Dec 1, 2026
- 59--CONNECTOR,BULKHEAD,ELE · RFP · Due Dec 1, 2026
- 59--BACKSHELL,ELECTRICAL C · RFP · Due Dec 1, 2026
- 59--FILTER,RADIO FREQUENCY · RFP · Due Dec 1, 2026
- 59--COVER,ANTENNA · RFP · Due Dec 1, 2026
- 59--HEADSET-MICROPHONE · RFP · Due Dec 1, 2026
- 59--HEADSET-MICROPHONE · RFP · Due Dec 1, 2026
- 59--CONNECTOR,PLUG,ELECTRI · RFP · Due Dec 1, 2026
- 59--CONTACT,ELECTRICAL · RFP · Due Dec 1, 2026
- 48--VALVE,GATE · RFP · Due Dec 1, 2026
- 48--SLIDE-SLEEVE,SET · RFP · Due Nov 27, 2026
- 47--TUBE ASSEMBLY,METAL · RFP · Due Nov 27, 2026
- 59--REFLECTOR,ANTENNA · RFP · Due Dec 1, 2026
- 59--FILTER,RADIO FREQUENCY · RFP · Due Dec 1, 2026
- 59--CONNECTOR,PLUG,ELECTRI · RFP · Due Dec 1, 2026
- 59--CONTACT,ELECTRICAL · RFP · Due Dec 1, 2026
- 59--HARNESS,ELECTRICAL EQU · RFP · Due Dec 1, 2026
- 59--SOLENOID SUBASSEMBLY · RFP · Due Dec 1, 2026
- 48--VALVE,DIAPHRAGM,STOP · RFP · Due Nov 27, 2026
- 59--CAP,ELECTRICAL · RFP · Due Dec 1, 2026
- 59--CONTACTOR,NEUTRAL · RFP · Due Dec 1, 2026
- 20--RING,BACK UP · RFP · Due Nov 27, 2026
- 59--RELAY,SOLID STATE · RFP · Due Dec 1, 2026
- 59--SWITCH,PRESSURE · RFP · Due Nov 27, 2026
- 59--RELAY,ROTARY · RFP · Due Dec 1, 2026
- 59--CONNECTOR,PLUG,ELECTRI · RFP · Due Dec 1, 2026
- 59--WAVEGUIDE ASSEMBLY · RFP · Due Dec 1, 2026
- 47--COUPLING ASSEMBLY,SELF · RFP · Due Nov 27, 2026
- 59--CONNECTOR ASSEMBLY,ELE · RFP · Due Nov 27, 2026
- 59--BACKSHELL,ELECTRICAL C · RFP · Due Dec 1, 2026
- 59--PARTS KIT,ELECTRONIC E · RFP · Due Dec 1, 2026
- 59--FUSE,ENCLOSED LINK · RFP · Due Dec 1, 2026
- 59--THERMAL PAD KIT · RFP · Due Dec 1, 2026
- 59--RELAY,ELECTROMAGNETIC · RFP · Due Dec 1, 2026
- 59--MAST · RFP · Due Dec 1, 2026
- 59--SOCKET,PLUG-IN ELECTRO · RFP · Due Dec 1, 2026
- 61--MOTOR,DIRECT CURRENT · RFP · Due Dec 1, 2026
- 59--CONNECTOR,PLUG,ELECTRI · RFP · Due Dec 1, 2026
- 59--HOUSING,ELECTRONIC COM · RFP · Due Dec 1, 2026
- 48--VALVE,SAFETY RELIEF · RFP · Due Nov 30, 2026
- 59--CONNECTOR,RECEPTACLE,E · RFP · Due Dec 1, 2026
- 59--RESISTOR,THERMAL · RFP · Due Dec 1, 2026
- 48--COCK,POPPET DRAIN · RFP · Due Nov 27, 2026
- 59--COVER,ELECTRICAL CONNE · RFP · Due Dec 1, 2026
- 59--CONNECTOR,PLUG,ELECTRI · RFP · Due Dec 1, 2026
- 59--RELAY,ELECTROMAGNETIC · RFP · Due Dec 1, 2026
- 59--AMPLIFIER,AUDIO FREQUE · RFP · Due Dec 1, 2026
- 59--ATTENUATOR,VARIABLE · RFP · Due Dec 1, 2026
- 59--ANTENNA · RFP · Due Dec 1, 2026
- 59--CONTACT,ELECTRICAL · RFP · Due Dec 1, 2026
- 59--CAPACITOR,FIXED,ELECTR · RFP · Due Dec 1, 2026
- 59--CIRCUIT BREAKER · RFP · Due Nov 27, 2026
- 47--FLANGE,PIPE · RFP · Due Nov 27, 2026
- 59--CAPACITOR ASSEMBLY · RFP · Due Dec 1, 2026
- 48--VALVE,SAFETY RELIEF · RFP · Due Nov 27, 2026
- 47--CLAMP,HOSE · RFP · Due Nov 27, 2026
- 59--T CONNECTOR · RFP · Due Dec 1, 2026
- 59--AMPLIFIER,AUDIO FREQUE · RFP · Due Dec 1, 2026
About DEPT OF DEFENSE.DEFENSE LOGISTICS AGENCY.DLA MARITIME.DLA MARITIME COLUMBUS.DLA WEAPONS SUPPORT
Find the latest government contracts, RFPs (Request for Proposals), and bidding opportunities from DEPT OF DEFENSE.DEFENSE LOGISTICS AGENCY.DLA MARITIME.DLA MARITIME COLUMBUS.DLA WEAPONS SUPPORT. Our database is updated daily with new solicitations and contract opportunities.
Whether you're a small business or an established government contractor, Narwin.ai provides the tools and AI-powered insights you need to find and win contracts from DEPT OF DEFENSE.DEFENSE LOGISTICS AGENCY.DLA MARITIME.DLA MARITIME COLUMBUS.DLA WEAPONS SUPPORT.