USA 1d left
IRST Block II Full Rate Production (FRP) Lots 2 and 3 – Fuel Tank Assembly (FTA), Sensor Assembly Structure (SAS), and Final System Integration
DEPT OF DEFENSE.DEPT OF THE NAVY.NAVAIR.NAVAIR HQS.NAVAL AIR SYSTEMS COMMAND
Posted: Jul 29, 2026
Due Date
Aug 14, 2026
