Replace Underground Utilities - Phase 2, Vernon Military Camp, BC

Defence Construction Canada - Pacific Region
canadabuys Posted: August 18, 2026

As per the terms and conditions of the Open Construction Source List (PR26SLCH), you are invited to submit a bid for the following project: DEFENCE CONSTRUCTION CANADA (DCC) – Project No. CK208168_CN86972 – Replace Underground Utilities - Phase 2, Vernon Military Camp, BC The work includes, but is n...

Due Date
September 10, 2026
(23 days left)
Solicitation #
CK208168_CN86972

Actions

Create a free account to analyze this opportunity, get daily notifications, and win more bids with Narwin.ai

Documents

No documents are currently available in Narwin.

Visit original source to check related documents

Description

As per the terms and conditions of the Open Construction Source List (PR26SLCH), you are invited to submit a bid for the following project: DEFENCE CONSTRUCTION CANADA (DCC) – Project No. CK208168_CN86972 – Replace Underground Utilities - Phase 2, Vernon Military Camp, BC The work includes, but is not necessarily limited to, the supply of labour, material, supervision, and equipment necessary to replace the deteriorated water main, sanitary sewer and storm water drainage lines in order to meet the current and future demands at the Vernon Military Camp, and to meet current codes and standards. The resulting Contract will include an Indigenous Benefits Plan (IBP) that aims to provide opportunities for businesses owned and lead by Indigenous People. Canada’s free trade agreements pose no impediment to the inclusion of measures for the benefit of Indigenous Peoples and/or businesses in a procurement. Refer to the Tender documents for details. A site visit has been arranged for the following date, time, and location. It is highly recommended that bidders attend this visit. Date: August 25, 2026 Time: 12:00pm Location: 3100 15th Ave, Vernon, BC The estimated cost for this opportunity is in the range of $8,200,000. The Work must reach Substantial Completion no later than 415 calendar days after notification of contract award and must be completed no later than 30 calendar days after the date of Substantial Completion. This solicitation includes an Indigenous Benefits Plan (IBP) that aims to provide opportunities for businesses owned and lead by Indigenous People. Canada’s free trade agreements pose no impediment to the inclusion of measures for the benefit of Indigenous Peoples and/or businesses in a solicitation. This solicitation is being conducted in accordance with the requirements set out in the Canadian Free Trade Agreement (CFTA). Questions regarding this solicitation are to be directed ONLY to the point of contact identified in this advertisement. Bidders who address their questions to anyone other than the point of contact during the solicitation period may, for that reason alone, be disqualified. Please note that the preliminary tender results for this project will be available on MERX. Bidders can obtain contract award results from the DCC website at https://www.dcc-cdc.gc.ca/industry/contract-activity. DCC now publicly discloses information on payments made to prime contractors so that subcontractors know when they can expect payment. Information on payments made in the past 90 days on construction contracts over $100,000, as well as further information regarding DCC’s prompt payment commitment, can be obtained from the DCC website at https://www.dcc-cdc.gc.ca/industry/contract-activity. code : 1description : IBP Amount (as defined in the Supplementary Conditions), expressed in dollars ($)quantity : 1unitOfMeasure : Dollarcode : 2description : Asphalt removal - Full depth and disposal off-site (Specification Section 02 41 13.14, Paragraph 1.2.1)unitOfMeasure : Square Metercode : 3description : Excavate and re-grade existing ditches (Specification Section 31 23 33.01, Paragraph 1.3.6 & 1.3.7)unitOfMeasure : Cubic Metercode : 4description : Abandon existing manhole, all sizes, including disposal of cover, lid, riser and backfill as per Detail 31 DWG L-V41-8421-695 (Specification Section 31 23 33.01, Paragraph 1.3.16)unitOfMeasure : Eachcode : 5description : Abandon existing water services (Specification Section 31 23 33.01, Paragraph 1.3.18)unitOfMeasure : Eachcode : 6description : Abandon existing water Valves (Specification Section 31 23 33.01, Paragraph 1.3.20)unitOfMeasure : Eachcode : 7description : Remove existing DCVA and Meter at 15th Ave and backfill (Specification Section 31 23 33.01, Paragraph 1.3.21)unitOfMeasure : Eachcode : 8description : Remove exisitng Hwy 97 crossing meter and abandon chamber (Specification Section 31 23 33.01, Paragraph 1.3.22)unitOfMeasure : Eachcode : 9description : Remove and dipose existing fire hydrant assemblies (Specification Section 31 23 33.01, Paragraph 1.3.23)unitOfMeasure : Eachcode : 10description : Common excavation of unsuitable material, including disposal off-site for detention pond (Specification Section 31 24 13, Paragraph 1.3.3)unitOfMeasure : Cubic Metercode : 11description : Subgrade preparation for road widening (Specification Section 31 24 13, Paragraph 1.3.5)unitOfMeasure : Square Metercode : 12description : Replacement of unsuitable trench and embankment material, including disposal off-site; Replace with 75mm pit run gravel (Specification Section 31 24 13, Paragraph 1.3.6)unitOfMeasure : Toncode : 13description : Granular Sub-Base; 75mm granular, 300mm thick outside trench area (Specification Section 32 11 16.01, Paragraph 1.3.2 & 1.3.3)unitOfMeasure : Square Metercode : 14description : Granular Base; 19mm Crushed Base Course, 150mm thick outside trench area (Specification Section 32 11 23, Paragraph 1.3.2 & 1.3.3)unitOfMeasure : Square Metercode : 15description : Topsoil for detention pond, re-use from stockpile; 100mm thick (Specification Section 32 91 19.13, Paragraph 1.2.5)unitOfMeasure : Square Metercode : 16description : Supply and place hydraulic seeding for detention pond (Specification Section 32 91 19.16, Paragraph 1.3.4)unitOfMeasure : Square Metercode : 17description : Storm manhole, lid, slab, cover and frame - 1050 mm diam. as per Detail 20 DWG L-V41-8421-694 (Specification Section 33 05 13, Paragraph 1.5.1)unitOfMeasure : Eachcode : 18description : Sanitary manhole, lid, slab, cover and frame - 1050 mm diam. as per Detail 20 DWG L-V41-8421-694 (Specification Section 33 05 13, Paragraph 1.5.1)unitOfMeasure : Eachcode : 19description : Manhole Riser Section - 1050 mm diam. as per Detail 20 DWG L-V41-8421-694 (Specification Section 33 05 13, Paragraph 1.5.1)unitOfMeasure : Vertical Metercode : 20description : Sanitary sewer cleanout terminal or midblock - 150 mm diam. as per Detail 24 DWG L-V41-8421-694 (Specification Section 33 05 13, Paragraph 1.5.2)unitOfMeasure : Eachcode : 21description : Storm Flow Control Manhole 1200mm diam. c/w lid, slab, risers, cover, frame and flow control piping as per DWG L-V41-8421-679 (Specification Section 33 05 13, Paragraph 1.5.1)unitOfMeasure : Eachcode : 22description : Storm catch basin, as per Detail 27 DWG L-V41-8421-695 (Specification Section 33 05 13, Paragraph 1.5.2)unitOfMeasure : Eachcode : 23description : Precast concrete storm inlet and safety grillage - as per Detail 30 DWG L-V41-8421-679 (Specification Section 33 05 13, Paragraph 1.5.3)unitOfMeasure : Eachcode : 24description : Water main pipe - 75 mm diam. HDPE DR-11 c/w removals & surface restoration (Specification Section 33 11 16, Paragraph 1.7.1 & 1.7.2)unitOfMeasure : Metercode : 25description : Water main pipe - 100 mm diam. PVC DR-18 c/w removals & surface restoration (Specification Section 33 11 16, Paragraph 1.7.1 & 1.7.2)unitOfMeasure : Metercode : 26description : Water main pipe - 150 mm diam. PVC DR-18 c/w removals & surface restoration (Specification Section 33 11 16, Paragraph 1.7.1 & 1.7.2)unitOfMeasure : Metercode : 27description : Water Main Pipe - 200 mm diam. PVC DR-18 c/w removals & surface restoration (Specification Section 33 11 16, Paragraph 1.7.1 & 1.7.2)unitOfMeasure : Metercode : 28description : Gate valve - 100mm, as per Detail 14 DWG L-V41-8421-693 c/w removals & surface restoration (Specification Section 33 11 16, Paragraph 1.7.3)unitOfMeasure : Eachcode : 29description : Gate valve - 150mm, as per Detail 14 DWG L-V41-8421-693 c/w removals & surface restoration (Specification Section 33 11 16, Paragraph 1.7.3)unitOfMeasure : Eachcode : 30description : Gate valve - 200mm, as per Detail 14 DWG L-V41-8421-693 c/w removals & surface restoration (Specification Section 33 11 16, Paragraph 1.7.3)unitOfMeasure : Eachcode : 31description : Service piping - 50 mm diam. c/w removals & surface restoration (Specification Section 33 11 16, Paragraph 1.7.5)unitOfMeasure : Metercode : 32description : Service connection set - 50 mm diam. as per Detail 13 DWG L-V41-8421-693 c/w removals & surface restoration (Specification Section 33 11 16, Paragraph 1.7.5)unitOfMeasure : Eachcode : 33description : Service piping - 38 mm diam. c/w removals & surface restoration (Specification Section 33 11 16, Paragraph 1.7.5)unitOfMeasure : Metercode : 34description : Service connection set - 38 mm diam., as per Detail 13 DWG L-V41-8421-693 c/w removals & surface restoration (Specification Section 33 11 16, Paragraph 1.7.5)unitOfMeasure : Eachcode : 35description : Service piping - 32 mm diam. c/w removals & surface restoration (Specification Section 33 11 16, Paragraph 1.7.5)unitOfMeasure : Metercode : 36description : Service connection set - 32 mm diam., as per Detail 13 DWG L-V41-8421-693 c/w removals & surface restoration (Specification Section 33 11 16, Paragraph 1.7.5)unitOfMeasure : Eachcode : 37description : Service piping - 25 mm diam. c/w removals & surface restoration (Specification Section 33 11 16, Paragraph 1.7.5)unitOfMeasure : Metercode : 38description : Service connection set - 25 mm diam., as per Detail 13 DWG L-V41-8421-693 c/w removals & surface restoration (Specification Section 33 11 16, Paragraph 1.7.5)unitOfMeasure : Eachcode : 39description : Service piping - 19 mm diam. c/w removals & surface restoration (Specification Section 33 11 16, Paragraph 1.7.5)unitOfMeasure : Metercode : 40description : Service connection set - 19 mm diam., as per Detail 13 DWG L-V41-8421-693 c/w removals & surface restoration (Specification Section 33 11 16, Paragraph 1.7.5)unitOfMeasure : Eachcode : 41description : Yard Hydrant Stand pipe assembly c/w wood post and drain rock - as per Detail 10 DWG L-V41-8421-692 c/w removals & surface restoration (Specification Section 33 11 16, Paragraph 1.7.13)unitOfMeasure : Eachcode : 42description : Hydrant assembly - as per Detail 17 Dwg L-V41-8421-693 c/w removals & surface restoration (Specification Section 33 11 16, Paragraph 1.7.17)unitOfMeasure : Eachcode : 43description : Air Valve Vacuum Combo Chamber, as per Detail 31 DWG L-V41-8421-695 c/w removals & surface restoration (Specification Section 33 11 16, Paragraph 1.7.7)unitOfMeasure : Eachcode : 44description : HI-40 Rigid Pipe insulation, 25mm thick as per Detail 9 DWG L-V41-8421-692 (Specification Section 33 11 16, Paragraph 1.7.14)unitOfMeasure : Square Metercode : 45description : Wrap 200mm Pipe Joints with CANUS or approved equal (Specification Section 33 11 16, Paragraph 1.7.16)unitOfMeasure : Eachcode : 46description : Hot-tap Inline connection to existing 15th Ave 200 PVC main c/w gatevalve, removals & surface restoration (Specification Section 33 11 16, Paragraph 1.7.12)unitOfMeasure : Eachcode : 47description : Water meter Kiosk c/w DCVA, concrete pad, drain rock pit and electrical/mechanical components as per Detail 32 DWG L-V41-8421-696 c/w removals and surface restoration (Specification Section 33 11 16, Paragraph 1.7.15)unitOfMeasure : Eachcode : 48description : Connection to existing Sanitary manhole c/w removals & surface restoration (Specification Section 33 31 13, Paragraph 1.3.6)unitOfMeasure : Eachcode : 49description : Sanitary Sewer Piping - 150 mm diam., PVC DR-35 c/w removals & surface restoration (Specification Section 33 31 13, Paragraph 1.3.1 & 1.3.2)unitOfMeasure : Metercode : 50description : Sanitary Sewer Piping - 200 mm diam., PVC DR-35 c/w removals & surface restoration (Specification Section 33 31 13, Paragraph 1.3.1 & 1.3.2)unitOfMeasure : Metercode : 51description : Sanitary Service 100 mm diam., PVC; as per Detail 25 DWG L-V41-8421-694 c/w removals & surface restoration (Specification Section 33 31 13, Paragraph 1.3.1 & 1.3.2)unitOfMeasure : Metercode : 52description : Service connection c/w inspection chamber, as per Detail 25 DWG L-V41-8421-694 c/w removals & surface restoration (Specification Section 33 31 13, Paragraph 1.3.3 & 1.3.4)unitOfMeasure : Eachcode : 53description : CCTV (Specification Section 33 31 13, Paragraph 1.3.7)unitOfMeasure : Metercode : 54description : Connect to existing pipe to proposed storm manhole c/w removals & surface restoration (Specification Section 33 41 00, Paragraph 1.3.9)unitOfMeasure : Eachcode : 55description : Storm Service - 100 mm diam. PVC (Specification Section 33 41 00, Paragraph 1.3.1 & 1.3.2)unitOfMeasure : Metercode : 56description : Storm Sewer Piping - 375 mm diam. PVC, PVC DR-35 c/w removals & surface restoration (Specification Section 33 41 00, Paragraph 1.3.1 & 1.3.2)unitOfMeasure : Metercode : 57description : Storm Sewer Piping - 450 mm diam. PVC, PVC DR-35 c/w removals & surface restoration (Specification Section 33 41 00, Paragraph 1.3.1 & 1.3.2)unitOfMeasure : Metercode : 58description : Storm Sewer Piping - 525 mm diam. PVC, PVC DR-35 c/w removals & surface restoration (Specification Section 33 41 00, Paragraph 1.3.1 & 1.3.2)unitOfMeasure : Metercode : 59description : Catch basin lead - 200 mm diam. SDR35 PVC c/w removals & surface restoration (Specification Section 33 41 00, Paragraph 1.3.5)unitOfMeasure : Metercode : 60description : CCTV (Specification Section 33 41 00, Paragraph 1.3.11)unitOfMeasure : Metercode : 61description : 375 mm diam. CSP culvert c/w bedding sand, removals & surface restoration (Specification Section 33 42 13, Paragraph 1.3.3)unitOfMeasure : Metercode : 62description : 450 mm diam. CSP culvert c/w bedding sand, removals & surface restoration (Specification Section 33 42 13, Paragraph 1.3.3)unitOfMeasure : Metercode : 63description : Common trench communications conduit 2x100mm c/w Telus 2102 chambers, removals & surface restoration DWG. L-V41-8420-609 & 698 (Specification Section 01 11 00, Paragraph 1.1.1)unitOfMeasure : Metercode : 64description : Communications conduit 2x100mm c/w Telus 2102 chambers, removals & surface restoration DWG. L-V41-8420-609 & 698 (Specification Section 01 11 00, Paragraph 1.1.1)unitOfMeasure : Metercode : 65description : Balance of Project, complete - all other costs not included in items 2 to 64 (inclusive)quantity : 1unitOfMeasure : Lump-SumBidding and Documents are available on http://www.merx.com. Fees may apply; See https://www.merx.com/public/pricing for more information.

Additional Information

Amendment Number

001

Contact Info Email

Contact Info Name

Theresa Tran

Contact Info Phone

+16048328373

Contracting Entity Name

Defence Construction Canada - Pacific Region

Created

August 19, 2026

Is Public

true

Organization Address City

Victoria

Organization Country

Canada

Organization Address Line

Address pending

Organization Address Postal Code

V8W 2M6

Organization Address Province

British Columbia

Procurement Category

*CNST

Procurement Method

Competitive - Traditional

Reference Number

MX-444133199071

Source

canadabuys

Source Record ID

MX-444133199071_001

Source System

canadabuys

Status

open

Status En

Open

Tender Closing Date

September 10, 2026

Last Updated

August 19, 2026

Frequently Asked Questions

When is the proposal submission deadline?

The proposal submission deadline is September 10, 2026 (23 days left).

Where can I submit a proposal or get solicitation documents?

You can access the full solicitation documents and submit your proposal at the official source:

Visit Official Source

Narwin.ai is a great way to find government contracts and opportunities. Disclaimer: This bid/tender/opportunity information is presented as is and may be incorrect at times. Please read the tender documents carefully before finalizing bids. We do not accept any responsibility and cannot be held legally liable for any inaccuracies.