This opportunity has closed

The submission deadline was October 20, 2025. This page is kept for reference purposes.

View 5 similar active opportunities →

Prepare an Environmental Flow Needs (EFN) assessment for the Nanaimo River on Vancouver Island, British Columbia.

Department of Fisheries and Oceans (DFO)
CanadaBuys Posted: September 16, 2025

AI Summary

Summary of Opportunity

  1. Purpose:
    The main purpose of this Request for Proposal (RFP) is to invite qualified consultants or organizations to conduct a comprehensive Environmental Flow Needs (EFN) assessment for the Nanaimo River on Vancouver Island, British Columbia. This project is part of a rebuilding planning process aimed at supporting the recovery and long-term sustainability of Spring and Summer Chinook salmon populations. The assessment seeks to develop flow management recommendations that will aid in fish and fish habitat conservation throughout the watershed.

  2. Buyer Information:
    The issuing organization is the Department of Fisheries and Oceans (DFO), Government of Canada. Inquiries regarding the RFP can be directed to:

  3. Important Dates:

    • Posted Date: September 16, 2025
    • Due Date: October 20, 2025, at 2:00 PM ADT
    • Note: An amendment to the RFP indicates a prior submission deadline of October 13, 2025, which should be verified for current alignment.
  4. Key Requirements:
    The primary tasks required for the EFN assessment include:

    • Conducting a detailed hydrologic assessment of the Nanaimo River, including climate change considerations.
    • Collecting data through transects at specified flow percentages (5%, 10%, 15%, 20%, 25% of mean annual discharge) at a minimum of five locations.
    • Integrating Indigenous knowledge and cultural flow needs, particularly from the Snuneymuxw First Nation.
    • Assessing habitat-specific flow requirements focusing on sensitive habitats and critical summer Chinook reaches and fish passage locations.
    • Evaluating reservoir operations and water storage impacts including flow release strategies and temperature implications.

    Deliverables include various reports: an inception/work plan, data collection summary, draft and final EFN assessment reports, and a presentation to key stakeholders including DFO, the Snuneymuxw First Nation, and other relevant parties.

This opportunity represents a significant project aimed at environmental sustainability and fish recovery efforts, providing engaged organizations a way to contribute to local ecological goals while fulfilling contractual obligations with the DFO.

Due Date
October 20, 2025
(Overdue)
Solicitation #
30007120

Actions

Create a free account to analyze this opportunity, get daily notifications, and win more bids with Narwin.ai

Documents

30007120---rfp%28en_amd-001.pdf
PDF • 257.2 KB
30007120---addendum-002_en.pdf
PDF • 185.5 KB
paper---flow---griffiths-1990---nanaimo-river-ifr---study.pdf
PDF • 2.5 MB
30007120---rfp%28en_amd-002.pdf
PDF • 255.3 KB
30007120---rfp%28en_final.pdf
PDF • 1.0 MB
30007120---hop-wo-et-al_2005_nanaimo-flow-release-1_study.pdf
PDF • 14.0 MB
30007120---addendum-001_en.pdf
PDF • 174.5 KB

Description

Read full description

This Statement of Work invites qualified consultants or organizations (the “Contractor”) to conduct a comprehensive EFN assessment for the Nanaimo River on Vancouver Island, British Columbia. The project is a component of the rebuilding planning process for Nanaimo Spring and Summer Chinook, led in partnership between Fisheries and Oceans Canada (DFO) and the Snuneymuxw First Nation (SFN). Funded under the Pacific Salmon Strategy Initiative (PSSI), the project aims to support the recovery and long-term sustainability of these Chinook populations. The primary goal is to develop flow management recommendations for the Nanaimo River Flow Committee (NRFC) to support fish and fish habitat throughout the watershed. The primary focus of this EFN assessment is on the rearing, spawning, and migration needs of Nanaimo River Spring and Summer Chinook. The study will also incorporate ecosystem-level considerations - such as flow requirements for other aquatic species, habitat connectivity, water quality – where they directly support or inform flow recommendations for Spring and Summer Chinook and contribute to overall watershed health. This approach ensures that flow recommendations are ecologically robust within the constraints of the project scope. Tasks The Contractor must incorporate the following elements within the EFN assessment: Detailed hydrologic assessment of the Nanaimo River to characterize return flows, low flows, and mean annual discharge (MAD). This assessment should consider climate change and its implications for EFN thresholds. Undertake to acquire transects spanning five (5) flows at or near to 5,10,15,20, 25% of MAD at a minimum of five (5) locations. Indigenous knowledge (IK) and cultural flow needs, particularly those of the Snuneymuxw First Nation (SFN). Habitat-specific flow requirements, with emphasis on sensitive habitat types (e.g., prioritizing riffles). Prioritization of Critical Summer Chinook reaches and fish passage locations (see Appendix one (1) to SOW), including but limited to: a) Critical “Summer” Chinook Spawning Reach (Immediately downstream of 1st Lake), b) Critical “Spring” Chinook reaches above Nanaimo 2nd lake, c) Between 1st Lake downstream to the South Fork confluence, d) Critical adult fish passage locations at the Borehole and, White Rapids Falls, Important reaches for Chinook and other salmonid species (see Appendix one (1) to SOW): a) Below South Fork confluence, and b) Beneficial to include transect(s) in the South Nanaimo River. Reservoir operations and water storage impacts, including: a) Flow release strategies to stimulate fish movement, b) Temperature implications of the Low Level Outlet at 4th Lake Dam (if feasible), c) Role of South Nanaimo River and 4th Lake reservoirs in providing cold-water refugia (if feasible). Deliverables and Acceptance Criteria The Contractor must provide an inception/work plan report, The Contractor must provide a report of the data collection, raw data (including modeling files) and analysis summary, The Contractor must provide a report of the meeting summarizing initial findings, and discussion with DFO/SFN, following a kick-off meeting with DFO and SFN, The Contractor must provide a draft EFN assessment report, The Contractor must provide a presentation to the DFO, Snuneymuxw and stakeholders (Flow Committee participants; Harmac Pacific, City of Nanaimo, Province of British Columbia, Regional District of Nanaimo, Mosaic Forest Management), The Contractor must provide a final EFN assessment report with detailed methods and recommendations, report and all data will be property of DFO and may be published as a contractor’s report in DFO library.

Additional Information

Source

canadabuys

Status

closed

Procurement Method

Competitive - Open bidding

Procurement Category

Services

Reference Number

cb-710-1730572

Amendment Number

005

Contracting Entity

Department of Fisheries and Oceans (DFO)

Contact Name

Jackie Longmire

Contact Email

Contact Country

Canada

Organization City

Fredericton

Organization Province / State

New Brunswick

Organization Country

Canada

Last Updated

July 29, 2026

Frequently Asked Questions

When is the proposal submission deadline?

The proposal submission deadline is October 20, 2025 (Overdue).

Note: This opportunity has already closed. See similar active opportunities above.

Narwin.ai is a great way to find government contracts and opportunities. Disclaimer: This bid/tender/opportunity information is presented as is and may be incorrect at times. Please read the tender documents carefully before finalizing bids. We do not accept any responsibility and cannot be held legally liable for any inaccuracies.