APN-DESIGN & CONSTRUCTION OF THE SNOW AND ICE CONTROL / HEAVY EQUIPMENT FACILITY

Defence Construction Canada - Western Region
canadabuys RFP Posted: June 20, 2026

PROCUREMENT OVERVIEW The opportunity involves the design and construction of a Snow and Ice Control (SNIC) Heavy Equipment (HE) Facility located in Cold Lake, Alberta. This project is categorized as a modified design-build initiative aimed at fulfilling the operational needs of Defence Construction ...

Read full summary
Due Date
September 19, 2026
(32 days left)
Solicitation #

Actions

Create a free account to analyze this opportunity, get daily notifications, and win more bids with Narwin.ai

Documents

No documents are currently available in Narwin.

Visit original source to check related documents

Description

Advance Procurement Notice DESIGN AND CONSTRUCTION OF THE SNOW AND ICE CONTROL (SNIC) HEAVY EQUIPMENT (HE) FACILITY (MODIFIED DESIGN-BUILD) COLD LAKE, ALBERTA (with Security Requirements) Purpose of this Advance Procurement Notice This is not a bid solicitation nor a request for proposals.

Additional Information

Contact Info Email

Contact Info Name

Gerry Melake

Contact Info Phone

780-840-8000 x7058

Created

June 20, 2026

Deadline Text

2026/09/19

Is Public

true

Organization Address City

Edmonton

Organization Country

Canada

Organization Address Line

13220 St. Albert Trail, Suite 302

Organization Address Postal Code

T5L 4W1

Organization Address Province

Alberta

Reference Number

mx-444066561828

Source

canadabuys

Source Record ID

mx-444066561828

Status

open

Summary Updated At

June 22, 2026

Type

RFP

Last Updated

June 22, 2026

Frequently Asked Questions

When is the proposal submission deadline?

The proposal submission deadline is September 19, 2026 (32 days left).

Where can I submit a proposal or get solicitation documents?

You can access the full solicitation documents and submit your proposal at the official source:

Visit Official Source

AI Summary

PROCUREMENT OVERVIEW

The opportunity involves the design and construction of a Snow and Ice Control (SNIC) Heavy Equipment (HE) Facility located in Cold Lake, Alberta. This project is categorized as a modified design-build initiative aimed at fulfilling the operational needs of Defence Construction Canada (DCC) in managing snow and ice control effectively. The core objective is to establish a facility that meets the requirements for heavy equipment operations, ensuring readiness and efficiency in snow and ice management.

ISSUING ORGANIZATION

The issuing organization is Defence Construction Canada, specifically the Western Region. The organization is located in Edmonton, Alberta, Canada. The primary contact for this opportunity is Gerry Melake, who can be reached via email at [email protected].

KEY DATES

  • Posted Date: June 20, 2026
  • Proposal Due Date: September 19, 2026
  • Anticipated Award Date: Not specified
  • Performance Period: Not specified

CONTRACT DETAILS

The contract type is classified as a modified design-build. However, specific details regarding the estimated contract value or budget range have not been provided. There are no mentions of option years.

MANDATORY REQUIREMENTS

Bidders must meet the following mandatory requirements to be considered eligible:

  • Security Requirements: Specific security clearances are required, although the exact level has not been detailed.
  • Geographic Restrictions: The place of performance is limited to Cold Lake, Alberta.
  • Experience Requirements: Bidders must demonstrate relevant experience in design and construction projects, though no minimum years are explicitly stated.
  • Certifications: No specific certifications or registrations are mentioned, but bidders should be prepared to meet industry standards.

TECHNICAL CAPABILITIES

While specific technical skills and methodologies are not detailed, bidders should possess expertise in design-build construction processes, particularly in facilities that support heavy equipment operations. Familiarity with cold weather construction practices may be advantageous.

DELIVERABLES AND PERFORMANCE STANDARDS

The RFP does not specify key deliverables, milestones, or performance metrics. However, bidders should anticipate that the project will require adherence to typical construction timelines and quality standards associated with government contracts.

EVALUATION CRITERIA

The evaluation criteria for proposals have not been explicitly outlined in the provided information. Bidders should prepare to demonstrate their technical approach, past performance, and pricing strategy, as these are commonly prioritized in government procurement processes.

PREFERRED QUALIFICATIONS

While not mandatory, the following qualifications may provide a competitive advantage:

  • Experience with similar design-build projects, particularly in cold climate conditions.
  • Relevant industry certifications that demonstrate capability and reliability in construction practices.
  • Proven track record of successful project delivery within government contracts.

In summary, bidders should assess their fit based on the mandatory requirements, technical capabilities, and preferred qualifications while preparing for the upcoming proposal submission.

Narwin.ai is a great way to find government contracts and opportunities. Disclaimer: This bid/tender/opportunity information is presented as is and may be incorrect at times. Please read the tender documents carefully before finalizing bids. We do not accept any responsibility and cannot be held legally liable for any inaccuracies.