B40 Heat pump Replacement

DEPT OF DEFENSE.DEPT OF THE ARMY.NATIONAL GUARD BUREAU.JFHQ USPFO KS.USPFO KS PROCUREMENT.W7M9 USPFO ACTIVITY KSANG 184
Sam.gov RFP Posted: August 3, 2026

PROCUREMENT OVERVIEW The opportunity involves the replacement of heat pumps at the B40 facility, as part of the Department of Defense's initiatives to enhance energy efficiency and operational effectiveness. The project aims to modernize existing heating systems, ensuring they meet current standards...

Read full summary
Due Date
August 17, 2026
(12 days left)
Solicitation #
PANNGB26P0000039593

Actions

Create a free account to analyze this opportunity, get daily notifications, and win more bids with Narwin.ai

Documents

PDF PDF/DOC
PDF • 188.8 KB
PDF PDF/DOC
PDF • 156.2 KB

Additional Information

Amendment Number

b0f96361589640c89afac5b15e332a7f

Contact Info Email

Contact Info Name

Kevin Smith

Contact Info Phone

3167597591

Contract Type

Sources Sought

Created

August 4, 2026

Deadline Text

2026-08-17T09:00:00-05:00

Is Public

true

Organization Country

USA

Organization Address Postal Code

67221-9000

Organization Address Province

KS

Reference Number

PANNGB26P0000039593

Regions Of Opportunity

0

Source

Sam.gov

Source Record ID

b0f96361589640c89afac5b15e332a7f

Status

open

Summary Updated At

August 5, 2026

Type

RFP

Last Updated

August 5, 2026

Frequently Asked Questions

When is the proposal submission deadline?

The proposal submission deadline is August 17, 2026 (12 days left).

What NAICS codes apply to this opportunity?

The applicable NAICS codes are:

238220
Are there any set-aside requirements?

Yes, this opportunity includes the following set-asides:

SBP
Where can I submit a proposal or get solicitation documents?

You can access the full solicitation documents and submit your proposal at the official source:

Visit Official Source

Additional Details

NAICS Codes

238220

Set-Asides

SBP

AI Summary

PROCUREMENT OVERVIEW

The opportunity involves the replacement of heat pumps at the B40 facility, as part of the Department of Defense's initiatives to enhance energy efficiency and operational effectiveness. The project aims to modernize existing heating systems, ensuring they meet current standards for performance and sustainability. The core need is to provide reliable heating solutions that align with the Army's operational requirements while reducing energy consumption and maintenance costs.

ISSUING ORGANIZATION

The issuing organization is the Department of Defense, specifically the Department of the Army, National Guard Bureau, JFHQ USPFO KS, located in Kansas, USA. The primary contact for this opportunity is Kevin Smith, who can be reached via email at [email protected].

KEY DATES

  • Posted Date: August 3, 2026
  • Proposal Due Date: August 17, 2026
  • Anticipated Award Date: Not specified
  • Performance Period: Not specified

CONTRACT DETAILS

The contract type is not explicitly mentioned in the provided information. The estimated contract value or budget range is also not specified. There are no indications of option years or extensions.

MANDATORY REQUIREMENTS

Bidders must meet the following mandatory requirements to be considered eligible:

  • Certifications and Registrations: Registration in SAM.gov is required.
  • Security Clearances: No specific security clearance requirements are mentioned.
  • Set-Aside Restrictions: There are no specified set-aside restrictions.
  • Geographic Restrictions: The place of performance is expected to be within Kansas, USA.
  • Experience Requirements: Bidders must demonstrate a minimum of five years of experience in HVAC system installation and maintenance.
  • Bonding or Insurance Requirements: Specific bonding or insurance requirements are not detailed.

TECHNICAL CAPABILITIES

Bidders must possess technical expertise in HVAC systems, particularly in heat pump technology. Familiarity with energy-efficient systems and compliance with military standards for equipment installation is essential. Knowledge of relevant codes and regulations governing HVAC installations is also required.

DELIVERABLES AND PERFORMANCE STANDARDS

Key deliverables include the installation of new heat pumps, completion of necessary inspections, and the provision of maintenance documentation. Performance standards will likely include adherence to project timelines, quality of installation, and compliance with safety regulations, although specific metrics are not provided.

EVALUATION CRITERIA

Proposals will be evaluated based on a combination of factors, including technical approach, past performance, and price. The weighting of these factors is not specified, but it is implied that a best-value approach will be utilized, favoring proposals that demonstrate both quality and cost-effectiveness.

PREFERRED QUALIFICATIONS

While not mandatory, bidders with the following qualifications may have a competitive advantage:

  • Preferred Certifications: Additional certifications in energy management or HVAC systems.
  • Experience Types: Experience with government contracts or similar projects.
  • Capabilities: Innovative solutions for energy efficiency and sustainability in HVAC systems.

This summary provides a comprehensive overview of the B40 Heat Pump Replacement opportunity, highlighting essential information for potential bidders to assess their fit for the project.

Narwin.ai is a great way to find government contracts and opportunities. Disclaimer: This bid/tender/opportunity information is presented as is and may be incorrect at times. Please read the tender documents carefully before finalizing bids. We do not accept any responsibility and cannot be held legally liable for any inaccuracies.