This opportunity has closed

The submission deadline was November 6, 2025. This page is kept for reference purposes.

View 5 similar active opportunities →

Weir Rebuild - Water Survey of Canada Station at Two Forty Creek (08NM240) and Two Forty-One Creek (08NM241) near Penticton, British Columbia

Department of the Environment (ECCC )
CanadaBuys Posted: October 17, 2025

AI Summary

Summary of Opportunity Information

  1. Purpose:
    The main purpose of this Request for Proposal (RFP) is to seek a Contractor to conduct construction activities for the rebuilding of two hydrometric weirs located at Water Survey of Canada Stations: Two Forty Creek (08NM240) and Two Forty-One Creek (08NM241) near Penticton, British Columbia. The project aims to replace aging wooden weirs, remove sediment buildup, and restore the weir pools, ensuring the continued operation of these essential hydrometric stations that support various environmental and public safety initiatives.

  2. Buyer Information:
    The issuing organization for this opportunity is Environment and Climate Change Canada (ECCC).
    Contact Details:
    Helena Lee
    Email: [email protected]

  3. Important Dates:

    • Posted Date: October 17, 2025
    • Due Date: November 6, 2025, by 17:00 (5 PM PST)
    • Completion Anticipation: The construction work is expected to be completed within a twelve (12)-day timeframe.
  4. Key Requirements:

    • Construction Scope: Replacement of two weirs at specified creek stations and removal of sediment to restore the weir pools.
    • Environmental Considerations: Adherence to various environmental protection measures, including:
      • Creation of site-specific fire prevention and response measures.
      • Dust control during construction.
      • Compliance with the Environmental Management Plan prepared by Okanagan Nation Alliance.
      • Implementation of an Erosion and Sediment Control Plan for instream work.
      • Protection of riparian vegetation and wildlife, including complying with nesting period restrictions.
    • Safety and Traffic Management: The Contractor is responsible for public safety, including traffic control and maintaining safe access around the project site.
    • Permissions: A road closure permit from the City of Penticton is required for the staging area.
    • Schedule Notification: The Contractor must provide 10 days' notice of construction schedules to the contract administrator.

This information is vital for businesses considering submission for this opportunity, particularly those involved in construction, environmental management, and hydrological services.

Due Date
November 6, 2025
(Overdue)
Solicitation #
5000087954

Actions

Create a free account to analyze this opportunity, get daily notifications, and win more bids with Narwin.ai

Documents

5000087954_annex-b_two-forty-creek-related-photographs_en.pdf
PDF • 1.7 MB
5000087954_annex-b_drawings_240-creek-weir-design_2025.004.240_reva7_en.pdf
PDF • 2.4 MB
5000087954_invitation-to-tender_240-creek-%2808nm240-and-241-creek-%2808nm241_en.pdf
PDF • 300.7 KB
5000087954_annex-b_drawings_241-creek-weir-design_2025.004.241_reva7_en.pdf
PDF • 2.5 MB
5000087954_annex-a_specifications_en.pdf
PDF • 11.7 MB
5000087954_annex-b_two-forty-one-creek-related-photographs_en.pdf
PDF • 1.8 MB

Description

Read full description

Environment and Climate Change Canada (ECCC) maintains cableway and hydrometric gauging stations across approximately 500 sites in the Pacific and Yukon areas. The hydrometric data supports activities such as policy development, infrastructure design, water allocation, flood and drought response, recreation, navigation, ecosystem protection, and scientific study. Hydrometric stations typically consist of a “walk-in” or “look-in” instrument shelter and a cableway or metering bridge to measure discharge. Some stations include rated weirs to ensure accurate measurements of discharge at low water levels. Many weirs were constructed 20-50 years ago and require replacement or maintenance to ensure their continued operation. Two of these hydrometric weirs are found at the following stations: Two Forty Creek near Penticton (08NM240) and Two Forty-One Creek near Penticton (08NM241). These weirs were constructed with wood over 20 years ago and require replacement to ensure their continued operation. ECCC requires a Contractor to conduct construction activities to rebuild the two hydrometric weirs and remove sediment build up to reestablish the weir pool at the two Water Survey of Canada Stations: Two Forty Creek near Penticton (08NM240) and Two Forty-One Creek near Penticton (08NM241). Completion of the construction work scope is anticipated within a twelve (12)-day period. The requirement is subject to the provisions of the Canadian Free Trade Agreement (CFTA). For additional information, interested suppliers should contact Helena Lee at; [email protected].

Additional Information

Source

canadabuys

Status

closed

Procurement Method

Competitive - Open bidding

Procurement Category

Construction

Selection Criteria

Lowest Price

Regions of Opportunity

Canada

Regions of Delivery

Penticton

Reference Number

cb-66-49475180

Amendment Number

000

Contracting Entity

Department of the Environment (ECCC )

Contact Name

Helena Lee

Contact Email

Contact Phone

+17786172275

Contact Country

Canada

Organization City

Vancouver

Organization Province / State

British Columbia

Organization Country

Canada

Last Updated

July 29, 2026

Frequently Asked Questions

When is the proposal submission deadline?

The proposal submission deadline is November 6, 2025 (Overdue).

Note: This opportunity has already closed. See similar active opportunities above.

Explore More Opportunities

Open tenders from this agency

All tenders from Department of the Environment (ECCC ) 281 past tenders

Historical Contracts

Research past opportunities

All Active Opportunities

Search all current contracts

Narwin.ai is a great way to find government contracts and opportunities. Disclaimer: This bid/tender/opportunity information is presented as is and may be incorrect at times. Please read the tender documents carefully before finalizing bids. We do not accept any responsibility and cannot be held legally liable for any inaccuracies.